Waste to Energy Projects Generation Tariff Regulations, 2016

Chhattisgarh State Electricity Regulatory Commission (Terms and conditions for determination of generation tariff and related matters for waste to energy projects) Regulations,20l6

RegulationDated 27 Jun 2016No. 7 UCSERC/2016 dated 27th June 2016

Replaced by Renewable Energy Generation Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The CSERC (Terms and Conditions for Determination of Generation Tariff and Related Matters for Waste to Energy Projects) Regulations, 2016, notified at Raipur on 27 June 2016 (p1–2), create the framework under which the Commission fixes generation tariff for electricity produced from municipal solid waste (MSW) and refuse derived fuel (RDF) and sold to distribution licensees in Chhattisgarh. They were made under sections 61 and 86 read with section 181 of the Electricity Act 2003, taking the CERC's Fourth Amendment Regulations, 2015 on renewable-energy tariffs as a guiding factor, and cite the Swachh Bharat Mission's thrust on municipal waste management (p2). They come into force on 1 April 2016, backdated before the notification date, remain in force five years, and adopt a control period of five financial years running to end-FY 2020-21 (p2, p5).

Regulations 1–4 give commencement, extent, definitions and eligibility: a project must be at least 1 MW, use new plant and machinery on Rankine cycle technology, and burn MSW or RDF (p2–4). Chapter 1 (regs 5–11) sets the control period, a 20-year tariff period from commercial operation, the choice between project-specific tariff and suo-motu generic tariff, the petition and information requirements, the single-part tariff structure (two components for RDF, which has a fuel cost), levellised tariff design, and 'must run' dispatch status (p5–6). Chapter 2 (regs 12–23) states the financial principles: capital cost and its break-up, debt-equity ratio, loan tenure and interest, depreciation, return on equity, interest on working capital, O&M expenses, rebate, late payment surcharge, the treatment of these norms as ceilings, and the treatment of subsidy and of cess and duties (p7–8). Chapter 3 (regs 24–37) gives technology-specific norms — capital cost, plant load factor/CUF, auxiliary consumption, station heat rate, O&M, calorific value and fuel price — plus a monthly fuel-procurement and fuel-use monitoring mechanism routed through CREDA, RPO eligibility for the purchasing licensee, and powers to deviate from norms, relax provisions and remove difficulties (p9–11). Chapter 4 is miscellaneous (p11). Form 2.1 at p12 is a parameter-assumption template for MSW/RDF plants.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Renewable energy tariff

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document