HPERC · Himachal Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation and its Compliance Regulations, 2017 — Fifth Amendment, 2018
Himachal Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation and its Compliance) (Fifth Amendment) Regulations, 2018
AmendmentDated 27 Nov 2018No. HPERC/438 dated the 27th November, 2018
Replaced by Renewable Power Purchase Obligation and its Compliance Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page amendment notification issued by the Himachal Pradesh Electricity Regulatory Commission in Shimla on 27 November 2018 (p1). It amends the Commission's Renewable Power Purchase Obligation and its Compliance Regulations, 2017 — this being the Fifth Amendment to that instrument (p1).
Regulation 1 gives the short title and states that the amendment comes into force from the date of publication in the Rajpatra, Himachal Pradesh; the Gazette date itself is not printed (p1).
Regulation 2 makes two changes to regulation 4 of the 2017 Regulations. First, the table in regulation 4 is substituted in full with a new table of minimum Renewable Power Purchase Obligation (RPPO) percentages, split into Non-Solar, Solar and Total columns for three years — 2019-20, 2020-21 and 2021-22. Second, the numbering of the sub-regulations following sub-regulation (1) is corrected from (1) and (2) to (2) and (3) — a drafting fix (p1).
The substituted table carries footnotes (a) to (c) dealing with the base on which RPPO is computed, and with partial Solar and Non-Solar RPO compliance and treatment of energy purchased beyond the specified Solar RPO. The notification is signed by order of the Commission (p1).
Read with this
Voltaic does not hold the regulation itself.