MERC · Maharashtra Electricity Regulatory Commission
Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation, 2014 — First Amendment, 2017 — Draft
Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) (First Amendment) Regulations, 2017
Draft amendmentReleased with the notice dated 2 Aug 2017MERC/Legal/2017/____ dated __August, 2017
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC notification proposing the First Amendment to the 2014 Standards of Performance of Distribution Licensees Regulations (p1). Regulation 1 names the 2017 First Amendment Regulations and makes commencement depend on publication in the Official Gazette (p1). Regulation 2, on pp1–2, substitutes Regulation 5.3(a)(ii) and its proviso. The existing three-phase supply classification is replaced: the general contract-demand ceiling becomes “150 kW/ 187kVA”, and the separate Municipal Corporation ceiling is removed. The proviso is reworded for multiple consumers in the same building or premises whose cumulative contract demand exceeds that level, for whom the ceiling would be “480 kW / 600 kVA” (p2). The closing note records that the principal Regulations were notified on 20 May 2014 and corrected by a Corrigendum on 7 August 2014 (p2). The notification number and the day of the August 2017 date are blank.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 2 Aug 2017Public notice: Public Notice — Proposed Amendment to Standards of Performance of Distribution Licensees Regulations, 2014
- Dated 2 Aug 2017Explanatory memorandum: Standards of Performance of Distribution Licensees (First Amendment) Regulations, 2017 — Explanatory Memorandum — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.