MERC · Maharashtra Electricity Regulatory Commission

Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation, 2014 — First Amendment, 2017 — Draft

Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) (First Amendment) Regulations, 2017

Draft amendmentReleased with the notice dated 2 Aug 2017MERC/Legal/2017/____ dated __August, 2017

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft MERC notification proposing the First Amendment to the 2014 Standards of Performance of Distribution Licensees Regulations (p1). Regulation 1 names the 2017 First Amendment Regulations and makes commencement depend on publication in the Official Gazette (p1). Regulation 2, on pp1–2, substitutes Regulation 5.3(a)(ii) and its proviso. The existing three-phase supply classification is replaced: the general contract-demand ceiling becomes “150 kW/ 187kVA”, and the separate Municipal Corporation ceiling is removed. The proviso is reworded for multiple consumers in the same building or premises whose cumulative contract demand exceeds that level, for whom the ceiling would be “480 kW / 600 kVA” (p2). The closing note records that the principal Regulations were notified on 20 May 2014 and corrected by a Corrigendum on 7 August 2014 (p2). The notification number and the day of the August 2017 date are blank.

Standard name
Standards of Performance
Primary topics
Conditions of supply, Supply to buildings and colonies

Read with this

Voltaic holds no final regulation made from this draft.

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document