WBERC · West Bengal Electricity Regulatory Commission
Modalities of Tariff Determination Regulations, 2023 — Statement of Reasons
West Bengal Electricity Regulatory Commission (Modalities of Tariff Determination) Regulations, 2023
Statement of reasonsDated 4 Sep 2023
The commission's reasons for the Modalities of Tariff Determination Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's statement of reasons for the WBERC (Modalities of Tariff Determination) Regulations, 2023, signed at Kolkata and dated 4 September 2023 (p1, p5). It is not the operative regulation: it records why the Commission framed the regulations as it did, in response to the Supreme Court's direction of 23 November 2022 in Civil Appeal No. 1933 of 2022 (TPCL Transmission vs. MERC), which held that the criteria for choosing the tariff-determination modality must be notified by State Commissions through s.181 regulations or s.61 guidelines, and required such regulations within three months (p1–2).
Pages 2–3 set out the consultation trail: the draft regulations were published on 15.06.2023 with comments due 12.07.2023, and five stakeholders responded — WBSEDCL, WBPDCCL, Hiranmaye Energy Limited, Reliance Jio Infocom Limited and Summit Digitel Infrastructure Limited (p2). The Commission states it followed the Electricity (Procedure for Previous Publication) Rules, 2005 (p2).
The bulk of the document (p2–5) is an issue-by-issue account: each draft provision is quoted, the stakeholder comment is reproduced, and the Commission gives its analysis and the resulting change. It covers the definition of "Existing Project" and the treatment of partially commissioned projects; capacity expansion by private developers and pass-through of infrastructure and technology benefits; ceiling/cap tariffs for renewable sources and a new provision for grant-funded projects; the option of advance tariff determination for hydro and pumped-storage projects selling through long-term PPAs; a provision for new State-owned thermal plants; conformity of intra-State transmission projects with the approved State Transmission Plan, with an exception for urgent works and connectivity to 132 kV-and-above consumers; and retention of the TBCB threshold for intra-State transmission projects (p2–5).
It closes with a caveat that suggestions not specifically elaborated were still considered, and signatures of the Member and Chairperson (p5).
Read with this
The regulation
- Dated 4 Sep 2023Modalities of Tariff Determination Regulations, 2023
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.