Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Modalities of Tariff Determination Regulations, 2023

West Bengal Electricity Regulatory Commission (Modalities of Tariff Determination) Regulations, 2023

RegulationDated 4 Sep 2023Published in the Gazette 4 Sep 2023No. 77/WBERC dated 04.09.2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the WBERC's framework regulation fixing *how* tariffs in West Bengal are to be determined — which route (regulated tariff mechanism under Section 62 or competitive bidding under Section 63) applies to which kind of project. It was notified as No. 77/WBERC on 4 September 2023 and comes into force on Gazette publication (p1).

Regulation 1 gives the title, commencement and State-wide extent; Regulation 2 defines the operative vocabulary — Act, Commission, Existing Project, Ongoing Project, InSTS, Regulated Tariff Mechanism (RTM), STU, STU Transmission Plan, TBCB, Tariff Regulation (the 2011 Terms and Conditions of Tariff Regulations) and Year (p1–2).

Part A (Regulations 3–4, p2–3) governs power purchase approval for the distribution licensee. It keeps existing RTM-tariffed projects under Section 62 for the remainder of the PPA or plant life; routes State-owned/State-controlled expansion and incremental private expansion (capped at a one-time addition) through RTM; requires pass-through of infrastructure-sharing and new-technology benefits; brings approved waste-to-energy PPAs under RTM; allows the Commission to cap tariffs for small renewable projects below the competitive-bidding threshold; and gives hydro and pumped-storage developers an opt-in to Section 62 subject to stated PPA conditions. Everything else is to be competitively bid under Section 63 with prior Commission approval of the capacity to be bid.

Part B (Regulations 5–7, p3) covers transmission. The STU must annually prepare and submit a rolling five-year State Transmission Plan, and no intra-State transmission project may proceed unless it is in that plan, subject to a narrow urgent-works exception. New greenfield intra-State projects above a stated cost threshold go to TBCB with Commission adoption of the discovered tariff and STU as bid-process coordinator; all other plan projects stay under Section 62, with augmentation works done by the owning licensee on case-to-case approval.

Part C (Regulation 8, p4) simply confirms retail tariffs follow Section 62 and the Tariff Regulations. Part D (Regulations 9–12, p4) preserves existing and ongoing projects' existing arrangements, and gives the Commission powers to relax, amend and remove difficulties.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Competitive bidding, Power procurement and PPAs

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document