MSERC · Meghalaya State Electricity Regulatory Commission
SPC-DSM Operating Procedures & Business Rules
Operating Procedures & Business Rules
ProcedureDated 4 May 2026
Made under the Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short procedural document issued by the State Load Despatch Centre (SLDC) that constitutes and governs the State Power Committee – Deviation Settlement Mechanism (SPC-DSM) for the state, under Regulation 10.1 of the MSERC (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2025 (p2). The name SPC-DSM is chosen to distinguish it from other similarly named government committees (p2).
Sections 1–3 set out the preamble, the committee's objectives — facilitating intra-state energy exchange, implementing the DSM Regulations, promoting grid discipline, addressing implementation challenges and giving structured advice to SLDC and MSERC — and the legal basis, which also cites the Electricity Act 2003, IEGC and the MSERC State Grid Code (p2).
Sections 4–6 constitute the body: membership from SLDC (chair), STU, distribution licensees, state generating company/IPPs, open access consumers/traders and an SLDC convenor, with minimum rank floors and provision for additional members or special invitees; a two-year member tenure; and roles covering coordination, monitoring of compliance with schedules and deviation limits, advisory guidance to SLDC on operating procedures, and advisory input to MSERC on procedures, practice directions and regulation amendments, routed through SLDC. The committee is expressly advisory only — it cannot issue instructions overriding SLDC's statutory authority, adjudicate disputes or impose penalties (p3).
Sections 7–13 cover the working machinery: at least quarterly meetings plus emergency meetings at the Chairperson's call, notice periods, quorum, physical/virtual/hybrid modes, consensus decision-making with recorded dissent, SLDC secretariat support, minutes within seven working days and action-taken reports, confidentiality and data-sharing limits, periodic review with any amendment requiring MSERC approval, and entry into force on MSERC approval (p3–4). No approval or Gazette date is printed anywhere.
Read with this
The regulation
2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft not held as English text and 1 procedure or order made under it.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.