MSERC · Meghalaya State Electricity Regulatory Commission
Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025
Meghalaya State Electricity Regulatory Commission (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2025
RegulationDated 27 Oct 2025MSERC/REGULATIONS/DSM/2025/245 dated 27th October 2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MSERC's principal intra-State deviation settlement regulation, notified as MSERC/REGULATIONS/DSM/2025/245 dated 27 October 2025. Pages 1–2 are the notification and order: the preamble sets out the need to balance generation and consumption within the State grid, names the stakeholders (state generators, distribution utility, transmission company, open access consumers), records that a draft was published on 29 July 2025 for comments by 28 August 2025, lists the four parties who responded (BIA, Pioneer Carbide, Dalmia Cement Bharat, MePTCL) and a hybrid public hearing on 16 September 2025, and closes with the Commission's approval and signatures. The regulations themselves start at p3.
Chapter 1 (p3) gives the short title, applies the regulations geographically to Meghalaya and to all inter/intra-State entities connected with the STU, and makes them effective from Gazette publication. Chapter 2 (p3) states the objective: a commercial mechanism to make grid users adhere to their schedules. Chapter 3 (pp3–8) is an unusually long definitional chapter covering deviation, contract rate, reference charge rate, available capacity, WS sellers, QCA, ESS-related terms, MSC/SSC consumers and the pool accounts.
Regulation 4 (p9) fixes applicability by category — state generating stations, conventional and renewable generators (RE above 5 MW, long/medium/short-term sellers and CGPs), distribution licensees, and open access/captive users. Regulation 5 (pp10–11) lays down the duties of SLDC and state entities: contract disclosure, Grid Code compliance, connection/open access agreements, interface metering and communication, binding SLDC despatch instructions, and publication of information.
Chapter 6 (pp12–17) is the operative core: computation of deviation for general sellers, WS sellers and buyers (with a change of formula between the initial period up to 31.03.2026 and 01.04.2026 onwards, 'X' being left to a later order); normal rate of deviation charges imported from the CERC DSM Regulations 2024; frequency-linked and volume-linked charge tables for general sellers (with separate, frequency-independent treatment for run-of-river hydro and municipal-solid-waste stations and for WS sellers); treatment of standalone energy storage, WS-plus-ESS, infirm power, start-up power, forced outages and multiple contracts. Regulation 7 (p18) routes declaration of capacity and scheduling to the State Grid Code, Open Access Regulations and IEGC, with a proviso for MePDCL scheduling of uncleared power, and Regulation 7(A) (p18) creates a gaming enquiry and disallowance power.
Regulation 8 (p19) deals with energy accounting and settlement at the drawal point for Single Supply and Multiple Supply Consumers, including the interaction with contract demand and tariff orders. Chapter 9 (pp20–22) establishes the State DSM Account: monthly billing by SLDC, meter-reading and schedule verification timelines, contents of the SDSMA bill, the State Deviation Pool Account, payment and payout timelines, interest on delay, Letter of Credit requirements with an illustration, appropriation sequence for receipts, and use of surplus funds. Regulation 10 (pp23–24) covers governance (a State Power Committee with operating procedures within three months of notification), repeal and savings of the 2018 DSM and 2018 solar/wind forecasting regulations, and the Commission's powers to amend, remove difficulties, relax and issue directions.
Read with this
Procedures and orders made under it
- Dated 4 May 2026SPC-DSM Operating Procedures & Business Rules
2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft not held as English text and 1 procedure or order made under it.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.