Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Public Notice — Comments on Draft Distribution Open Access Regulations, 2015

INVITING COMMENTS ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015

Public notice on a draftDated 16 Sep 2015ADVT. No. : 09/2015-16 dated 16.09.2015

Draft

Voltaic holds no final regulation made from this draft.

Public notice on the Distribution Open Access Regulations, 2015 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a one-page public notice dated 16 September 2015 from the Maharashtra Electricity Regulatory Commission (MERC), issued as Advertisement No. 09/2015-16 (p1). It announces that the draft MERC (Distribution Open Access) Regulations, 2015 is available for download on the Commission’s websites and invites comments, suggestions or objections (p1).

Responses are to be sent to the Secretary, MERC, at the World Trade Centre address by hand, post, e-mail or fax, using the contact details given in the notice, and must be received on or before 8 October 2015; all responses received by that date will be considered (p1). The notice is signed by Secretary Ashwani Kumar from Mumbai (p1). It contains no draft regulatory text or summary of the proposed open-access framework.

Standard name
Open Access Regulations

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document