Skip to content

GERC · Gujarat Electricity Regulatory Commission

Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2019

Gujarat Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019

RegulationDated 19 Jan 2019Published in the Gazette 19 Jan 2019Notification No. 1 of 2019 dated 19/01/2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is GERC's principal regulation for how wind and solar generators connected to the Gujarat state grid are forecast, scheduled and financially settled when they deviate from schedule. It was notified on 19 January 2019 as Notification No. 1 of 2019 in the Gujarat Government Gazette, Extraordinary (pp1). Under clause 1.2 it takes effect from the date of notification, while the deviation charges in it take effect separately from 1 August 2019 (p1). Clause 2 fixes who is covered: wind and solar generators with combined installed capacity above 1 MW connected to the state grid or a substation, including through pooling stations, whether selling inside or outside Gujarat or self-consuming (p1–2).

Regulations 2–3 give the working vocabulary — absolute error, available capacity, deviation, gaming, pooling station, QCA, time-block, State Pool Account and similar terms (pp2–3). Regulation 4 states the objective: enabling large-scale grid integration of wind and solar while maintaining grid stability and security, with the grid operator required to use forecasts and conventional-plant flexibility (p3).

Regulation 5 is the Forecasting and Scheduling Code: who forecasts, day-ahead and week-ahead schedule submission, the notice window and daily caps on intra-day revisions, telemetry and metering duties, the SLDC's own forecast, and the requirement for a Detailed Procedure to be prepared by SLDC and approved by the Commission (pp4–5). Regulations 6 and 7 deal with the Qualified Coordinating Agency — its role as single point of contact with SLDC, registration, settlement and de-pooling duties, agreements and payment security, and the eligibility criteria a QCA must meet (pp5–6).

Regulation 8 sets out the commercial mechanism and deviation settlement, with Table-I for wind and Table-II for solar, and routes generators selling outside the state to the CERC deviation framework (pp7–8). Regulations 9–12 cover metering and energy accounting, the QCA–SLDC communication software, access to meter data, and the computation and settlement of deviation charges, including a stated interim arrangement up to 31 July 2019 without financial implications (pp8–10). Regulation 13 allocates payment responsibility and payment security and sets default interest; Regulation 14 governs curtailment; Regulations 15–16 cover weekly energy accounts, a verification window and de-pooling of deviations to individual generators; Regulations 17–19 preserve the Commission's powers to relax, direct and amend (pp10–11).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document