Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2019 — Statement of Reasons

STATEMENT OF REASONS GERC (FORECASTING, SCHEDULING, DEVIATION SETTLEMENT AND RELATED MATTERS OF SOLAR AND WIND GENERATION SOURCES) REGULATIONS, 2019

Statement of reasonsDated 13 Jan 2017

The commission's reasons for the Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 35 of 89. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SoR) accompanying the final GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019. It records stakeholder objections and the Commission's decisions on the draft 2017 regulations (p1–2). The Commission rejected requests for a 12-month delay and kept the six-month implementation window for the Commercial Mechanism, with Deviation Charges effective from 1 August 2019 (p2–3).

Scope was a major point: the Commission declined exemption thresholds proposed by several objectors and set applicability to all wind/solar generators above 1 MW combined capacity connected to the State grid, including pooling stations and self-consumption (p3–5). Definitions in Regulation 3 were reworked — Absolute Error remains referenced to Available Capacity (p6); 'Intra-State Entity' replaces 'State Entity' (p11–12); 'State Pool Account' replaces 'Pool Account' (p12); and 'Scheduled Generation/Drawal' now in MW or MWh (p11).

QCA rules dominate the middle of the document: revised definition and registration with SLDC (p10–11), no aggregation of more than one pooling station (p23), limited liability to deviation charges, and a 110% bank guarantee/revolving LC payment security mechanism (p31–33). Scheduling was also tightened: week-ahead instead of three-day-ahead, day-ahead by 9 AM, revisions only if >2% of previous schedule, and caps of 16 intra-day revisions for wind and 9 for solar within a 05:30–19:00 window (p14, p27–30). Metering, telemetry, format and Detailed Procedure are left to SLDC, to be approved by the Commission within one month (p15–19, p30–31).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.