CERC · Central Electricity Regulatory Commission
Tariff Regulations, 2019
Gazette – Tariff Regulations, 2019
RegulationDated 3 May 2019Published in the Gazette 3 May 20191/236/2018/ dated MAY 3, 2019
Replaced by Terms and Conditions of Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 86 of 574. Check the regulator's original before you rely on it.
This is the central regulator's tariff framework for the 2019–24 control period, published in the Gazette of India (Extraordinary), Part III–Section 4, No. 144, dated 3 May 2019 (p1). Within the supplied pages it reads as a principal regulation: a long definitions clause, a control-period and applicability chapter, chapters on capital cost, depreciation, return and operating costs, a chapter of normative operating parameters for generating stations, and annexures plus tariff-filing forms.
Chapter 1 (pp1–9) carries the short title and commencement and then defines the vocabulary used throughout, running to roughly seventy defined terms. Chapter 2 (pp9–10) deals with the procedure for determining tariff and refers back to the 2014 regulations. Chapter 3 (pp10–13) fixes applicability and the control period of 1 April 2019 to 31 March 2024, and deals with the tail of the earlier 2014–19 period.
Chapters 4 and 5 (pp13–19) govern how capital cost and funding are treated — the 70:30 debt-equity benchmark appears on p15 — covering capitalisation, interest during construction and exchange-rate variation, with Reg 23 listing rates that apply to them. The chapters that follow (pp19–33) cover depreciation, return on equity and working capital, supported by year-wise rate tables from p26 to p31.
The transmission/licensee chapters (pp33–43) and the normative-parameters chapter (pp42–53) set availability, heat rate, auxiliary consumption and secondary-fuel-oil norms for generating stations, largely in tables keyed to unit size and configuration (pp45–52). Formulae for computing actual transmission capacity follow (pp53–65), and the remainder is a set of blank schedules and forms for tariff petitions and data submission (pp67–86).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.