CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2024

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024

RegulationDated 15 Mar 2024In force from 1 Apr 2024No.L-1/268/2022/CERC dated 15th March, 2024

2 amendments to it are on Voltaic, the latest dated 20 Mar 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 40 of 175. Check the regulator's original before you rely on it.

This is CERC's principal tariff regulation for the 2024–29 control period. Issued as Notification No.L-1/268/2022/CERC dated 15 March 2024, it comes into force on 1.4.2024 and remains in force until 31.3.2029 unless reviewed earlier or extended; pending pre-commencement projects have their tariff up to 31.3.2024 determined under the 2019 regulations (p1). It applies where the Commission must determine tariff for generating stations/units and transmission systems/elements under s.62 read with s.79, including coal/lignite supply from integrated mines, but excludes s.63 competitively bid projects and renewable projects under the RE Tariff Regulations, 2020 (p2).

Chapter 1 (pp1–19) sets scope, exclusions, definitions and interpretations; it defines tariff terms, integrated mine concepts, emission-control system, useful life and reference interest rate. Chapter 2 (pp20–22) covers COD for conventional assets and integrated mines, sale of infirm power, and pre-COD supply of coal/lignite. Chapter 3 (pp22–32) lays out tariff petition procedure: applications, timelines, interim tariff, carrying cost, in-principle approval, and truing up for 2019–24 and 2024–29. Chapter 4 (pp33–35) sets the tariff structure — capacity, energy and supplementary charges for thermal, hydro and transmission. Chapter 5 (pp36–37) provides debt-equity norms. Chapter 6 (pp38–40) begins capital-cost computation for new and existing projects, including hydro R&R and RGGVY/DDUGJY contributions. Later chapters and Annexure-I are not visible.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

Commencement notices and reasons

Other copies of these documents (3)

Earlier drafts

4 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document