JSERC · Jharkhand State Electricity Regulatory Commission
Terms and Conditions for Determination of Transmission Tariff Regulations, 2015 — 1st Amendment, 2019
Jharkhand State Electricity Regulatory Commission Terms and Conditions for Determination of Transmission Tariff (1st Amendment) Regulations, 2019
AmendmentDated 10 Oct 2019Published in the Gazette 10 Oct 2019Notification No. 70 dated 10th October, 2019
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Jharkhand State Electricity Regulatory Commission's Notification No. 70 of 10 October 2019, the first amendment to the JSERC (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2015 (p1). It is a short, single-purpose instrument.
The substantive change is a deletion. Once the JSERC (Framework for sharing of Transmission charges) Regulations, 2019 are notified, the entire allocation-of-annual-transmission-charge block of the Principal Regulations — clauses 8.9 to 8.15 — stands deleted (p1–3). Part B reproduces those seven clauses in full so the record shows exactly what falls away: the monthly division of the Annual Transmission Charge among beneficiaries, charges for systems built for a particular long-term customer, the intra-state pooling formula, the medium-term and short-term open access charge methodologies, the split of short-term open access receipts between the transmission licensee and other beneficiaries, and liability for plant capacity with no identified beneficiary (p2–3).
Part A carries the short title, the territorial extent (the whole State of Jharkhand) and commencement on publication in the Jharkhand Gazette (p1). The amendment does not itself substitute a new allocation methodology — that is left to the separate 2019 framework regulations. It is signed by the Commission's Secretary, Rajendra Prasad Nayak (p3).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 4 Oct 2019Changes some provisions: Framework for Sharing of Charges for Intra-State Transmission System, 2019
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.