Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Terms and Conditions for Determination of Transmission Tariff (Revision-V) Regulations, 2024

Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) (Revision - V), Regulations, 2024 {RG – 28 (V) of 2024}

RegulationDated 20 Jun 2024No. 1508/MPERC/2024 dated 20th June 2024

1 amendment to it is on Voltaic, dated 11 Jun 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software, from pages 1 to 33 of 51. Check the regulator's original before you rely on it.

This is MPERC's fifth revision of its intra-State transmission tariff framework, notified on 20 June 2024 but given effect retrospectively from 1 April 2024 and running to 31 March 2029, deliberately aligned with the CERC control period (p1).

It governs how the State transmission licensee's tariff is determined and charged to distribution licensees and open access customers to whom transmission capacity has been allotted under the 2005 Intra-State Open Access Regulations (p2). Two framing rules matter: new intra-State transmission projects costing above Rs 400 Crore must be competitively bid and the tariff adopted under s.63 of the Act, not determined under these Regulations (p2); and all operating norms here are ceiling norms, which licensee and beneficiaries may improve on by agreement (p2).

Chapter I (pp1–9) sets commencement, scope and roughly 55 definitions. Chapter II (pp9–11) deals with commercial operation — where an element is ready but the interconnected generator or another licensee's system is not, and how transmission charges are borne when COD dates mismatch. Chapter III (pp11–18) sets the determination procedure: MYT petition contents, publication and hearings, the Commission's suo-motu power, truing up on controllable and uncontrollable factors, 50:50 sharing of controllable gains, interest-bearing refund/recovery of over- and under-recovery, and consequences of charging an unapproved tariff. Chapter IV (pp18–26) builds the tariff structure — capital cost, initial-spares ceilings by asset class, IDC and IEDC, additional capitalisation and de-capitalisation, R&M and the debt-equity split. Chapter V computes annual fixed cost: return on equity with tax grossing-up and illustrations, interest on loan, depreciation, lease charges, normative O&M, working-capital interest, foreign exchange variation and tax on income, with depreciation rates left to Appendix-I.

Standard name
Transmission Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

Amendments and corrections

Other copies of these documents (2)

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document