MPERC · Madhya Pradesh Electricity Regulatory Commission
Transmission Tariff Regulations (Revision-V), 2024
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) (Revision - V), Regulations, 2024 {RG – 28 (V) of 2024}
Regulation · Gazette copyDated 20 Jun 2024In force from 1 Apr 2024J578/MPERC/2024 dated 20th June 2024
The Gazette copy of the Terms and Conditions for Determination of Transmission Tariff (Revision-V) Regulations, 2024.
Summary
Summary written by software, from pages 1 to 93 of 111. Check the regulator's original before you rely on it.
What it is. This is the Madhya Pradesh Electricity Regulatory Commission's Terms and Conditions for Determination of Transmission Tariff (Revision-V) Regulations, 2024 — RG-28(V) of 2024, notification No. J578/MPERC/2024, issued at Bhopal on 20 June 2024. It sets the framework for fixing intra-State transmission tariffs for a fresh five-year control period, FY 2024-25 to FY 2028-29, superseding the principles of the 2020 regulations whose control period ended on 31/03/2024. It is in force from 1 April 2024 — retrospective to the start of the financial year — and runs to 31 March 2029 unless reviewed or extended (p61). It extends to the whole of Madhya Pradesh and applies to tariff determined under Section 62 of the Electricity Act, 2003 and charged by the transmission licensee to distribution licensees and open access customers. New intra-State transmission projects costing above Rs. 400 Crore are carved out: their tariff is to come through transparent bidding and be adopted under Section 63 after prudence check (p62).
Chapters I–II (pp61–71). Chapter I carries the short title, extent, commencement, scope and the rule that the operating norms are ceilings, which licensees and beneficiaries may improve on by agreement. It then defines 55 terms — capital cost and additional capitalisation, COD, availability, change in law, force majeure, beneficiary and the long/medium/short-term transmission customer classes, among others — and gives a useful-life table by asset type. Chapter II governs commercial operation: a licensee whose system is ready before the interconnected generating station or another licensee's system may petition the Commission for approval of a COD date, with prior notice and a listed set of supporting documents, and it fixes who pays transmission charges while a COD mismatch persists (p69–71).
Chapter III (pp71–78). The procedures: filing a consolidated Multi Year Tariff petition at the start of the control period, scrutiny and return of deficient petitions, publication of the petition on the licensee's website, hearing, and orders. Regulation 10 gives the annual truing-up methodology, splitting controllable and uncontrollable factors and prescribing how gains and losses are shared, recovered or refunded in instalments with interest. Annual accounts and performance statements, limits on how often tariff may be revised, and exposure under Section 142 for billing above approved tariff follow (p72–78).
Chapter IV (pp78–86). The tariff structure: capital cost heads and the base for admitted capital cost, ceiling percentages for capitalised initial spares by asset type, interest and incidental expenditure during construction, the grounds on which additional capitalisation may be admitted and assets de-capitalised, the Renovation and Modernisation approval route, and debt-equity treatment that differs for projects commissioned before and on/after 1.4.2024.
The Annual Fixed Cost components and the methodology for each: return on equity at a base rate grossed up for effective tax, interest and finance charges on normative loan, straight-line depreciation with a salvage floor and Appendix-I rates, lease/hire-purchase charges, normative O&M expenses, interest on working capital, foreign exchange variation hedging, and tax on income.
Read with this
The regulation
Amendments and corrections
Other copies of these documents (1)
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.