WBERC · West Bengal Electricity Regulatory Commission
State Electricity Grid Code (Amendment) Regulations, 2009
West Bengal Electricity Regulatory Commission (State Electricity Grid Code) (Amendment) Regulations, 2009
AmendmentDated 22 May 2009Published in the Gazette 22 May 2009No. 43/WBERC dated 22nd May, 2009
Amends the State Electricity Grid Code Regulations, 2007.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a nine-clause amendment by the West Bengal Electricity Regulatory Commission to its State Electricity Grid Code Regulations, 2007 (Notification No. 34/WBERC dated 04.04.2007), issued under s.181 and s.86(1)(h) of the Electricity Act, 2003 and taking effect on gazette publication (p1).
Clause 2 inserts a new regulation 3.6.4(v) and is the most consequential part: STU/SLDC must not permit synchronization of any new generating unit unless ABT-compliant meters are installed and commissioned for gross and ex-bus generation, with online real-time display at SLDC — the only exception being first test synchronization with explicit prior SLDC permission. A proviso carves out units commissioned before 1.1.2009 plus the 3rd Budge Budge and 5th BKTPP units where display is not yet available, provided the display is arranged by 1.1.2010 (p1–2).
The remaining clauses rework the day-ahead scheduling machinery in regulation 5.3 (pp2–3): they split declared capacity into "Actual Declared Capacity" and, for coal-fired stations, "Notional Declared Capacity"; fix the times by which SLDC receives the RLPC drawal schedule and finalizes initial injection and drawal schedules; prescribe how an outage of the first four Bandel or Santaldihi units is treated in the schedule for up to the 6th block; add a proviso making revised or deemed schedules effective within the 6th block in shortfall conditions; and set out the end-of-day provisional implemented schedule, the three-working-day window for disputes, and the finalized implemented schedule as the datum for commercial accounting. Clause 9 replaces the Note to Annexure-III to require destination-wise injection columns, a column for Actual Declared Capacity, an added column for Notional Declared Capacity, and daily coal receipt and consumption reporting in MT (p3).
Read with this
The regulation
- Dated 4 Apr 2007State Electricity Grid Code Regulations, 2007
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.