Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulation, 2021 — Statement of Reasons

Telangana State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulation, 2021 – Statement of Reasons thereof

Statement of reasonsDated 16 Jun 2021

The commission's reasons for the Telangana Deviation Settlement Mechanism and Related Matters Regulation, 2021 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software, from pages 1 to 26 of 43. Check the regulator's original before you rely on it.

This is TSERC's Statement of Reasons for its Telangana State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulation, 2021, dated 16.06.2021 (p1). It explains why the Commission finalised the DSM framework and records its response to public comments clause by clause; it is not the operative regulation text.

The introduction sets out the objective — grid discipline and grid security under the Indian Electricity Grid Code and State Electricity Grid Code — and the consultation history: a 2018 draft published on 05.01.2019, four stakeholder responses, then a fresh 2020 draft after CERC's Fifth Amendment of 28.05.2019; a public notice on 28.12.2020, comments due 19.01.2021 and extended to 19.02.2021, with eleven stakeholders listed in Annexure-1 (p1–2).

The clause-by-clause part covers commencement, definitions, applicability, duties, DSM principles, scheduling, gaming, deviation charges and volume limits. On commencement, the Commission fixes the effective date as 1 April 2022 rather than the draft's 1 March 2021 and directs TSSLDC to prepare an action plan and complete interface metering (p2–3). It rejects adding a Beneficiary definition, changes Connectivity Regulation to mean Open Access Regulation, and retains the Gaming definition (p3–5). Applicability is retained with modification: DSM covers buyers including distribution licensees and full open access consumers connected to In-STS, and sellers of 5 MW and above connected to In-STS and/or distribution, excluding in-situ captive generators and solar/wind (which stay under the 2018 solar/wind regulation); partial and distribution-connected open access remain under the Open Access Regulation (p5–7).

Later sections retain or modify provisions on SLDC/state entity duties and metering (p7–8); DSM design parameters such as 96 time blocks, merit-order despatch, frequency range, weekly settlement, measurement units, CERC price vector, volume limits and loss allocation (p9–15); declaration/scheduling and gaming, with exemptions for old thermal/hydel stations refused (p15–20); charges for deviation, caps, zero-charge bands, DAM ACP linkage and infirm power (p20–24); and buyer/seller volume limits, the X formula, additional charges and sustained-deviation sign-change charges (p24–26). Annexures include the stakeholder list (p2), CERC DSM price vector (p21) and additional-charge table (p24–26).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

It is also read with

The commission's reasons for a regulation Voltaic does not hold.

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document