Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Telangana Deviation Settlement Mechanism and related matters Regulation, 2020 — Draft

Telangana State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulation, 2020

Published with a draftDated 28 Dec 2020No.TSERC/_______/2020 dated 28.12.2020

Published with the draft Deviation Settlement Mechanism and related matters Regulation, 2020 — Consultation Notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft principal regulation by TSERC to establish a state-level deviation settlement mechanism (DSM) for open-access transactions in Telangana. The preamble records that TSERC had issued a draft DSM regulation in 2018 on 05.01.2019, that CERC notified the DSM Fifth Amendment on 28.05.2019, and that the Commission is now incorporating the CERC amendments and starting a fresh stakeholder consultation (p1).

Clauses 1–5 set the title, Telangana-wide extent and 1 March 2021 commencement, with a proviso that SLDC must complete software and trial-run arrangements and that the existing Open Access Regulation governs energy accounting until the effective date (p1–2). They define the core entities and concepts, state the grid-discipline objective, and apply the regulation to buyers and sellers in open-access transactions using intra-state transmission and/or distribution, including inter-state wheeling; partial open-access consumers and all distribution-connected open-access consumers remain under the Open Access Regulation, while solar and wind are routed to the separate 2018 forecasting and DSM regulations (p2–5). Clauses 5–8 then set duties for SLDC and State Entities, the design principles for the DSM (scheduling, despatch, frequency range, weekly settlement, measurement, price vector, volume limits and loss allocation), scheduling/declaration rules, and a gaming inquiry and disallowance procedure (p5–9).

Clauses 9–11 are the commercial core: they specify how deviation charges are payable or receivable, tolerance and cap arrangements, the infirm-power treatment, the volume limits and the formula for buyer-specific limits, additional charges for crossing limits and for sustained deviation, the sign-change requirement with its penalty table and exemptions, and the treatment of infirm and start-up power (p9–13). Clause 12 begins the operational framework. Clauses 12–16 set out SLDC procedures, weekly deviation accounts, the State Energy Account, compliance with SLDC instructions, the State Deviation Pool Account and its payment waterfall, the payment timetable, late-payment interest and letter-of-credit security (p13–16). Clauses 17–23 create the State Power Committee, give the Commission amendment, direction, relaxation and difficulty-removal powers, repeal the 2014 adoption regulation to the extent covered with savings, and route inquiries through the Conduct of Business Regulations (p17–18). Annexure I reproduces the CERC-linked DSM price vector; Annexure II contains additional-charge tables for buyers and sellers; Annexure III illustrates the price vector (p19–23).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Scheduling and despatch

Read with this

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document