MERC · Maharashtra Electricity Regulatory Commission
Electricity Supply Code and Other Conditions of Supply Regulations, 2015 — Draft
Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2015
Draft regulationReleased with the notice dated 22 Apr 2015No. MERC/Legal/129/2015/---
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Maharashtra Electricity Regulatory Commission's draft Electricity Supply Code and Other Conditions of Supply Regulations, 2015, made under the Electricity Act, 2003 and expressly marked as a draft (p1, p4). It is the State's principal distribution-service code, intended to replace the 2005 Supply Code, and it applies to all distribution licensees, including deemed licensees, to consumers in Maharashtra, to persons exempt under Section 13, and to unauthorised supply/use and diversion cases (p5, p91).
Chapter 1 sets the title, scope and commencement, creates the Electricity Supply Code Review Panel, and lays down the process for reviewing and amending the Code (pp5–7). Chapter 2 is the definitions chapter, fixing the vocabulary used across supply classification, connections, metering, billing, theft and disconnection (pp8–15).
Chapter 3 prescribes the systems of supply and voltage bands for LT, HT, EHT and D.C. installations, load balancing and consumer classification (pp16–18). Chapter 4 authorises recovery of expenses for giving supply, charges for electricity, wheeling and statutory surcharges (pp19–21). Chapter 5 is the operational core: application forms, inspection and defect procedures, demand notes, release timelines, single-point supply, temporary and Tatkal supply, name transfer, conversion, shifting, reclassification, load enhancement/reduction, annual contract-demand review, agreements, security deposits, access to premises and general supply conditions (pp22–49).
Chapter 6 covers meters — procurement, installation and sealing, reading, periodic testing, consumer-requested testing, and replacement of defective, burnt or lost meters (pp50–57). Chapter 7 prescribes billing intervals, bill contents, billing in special circumstances, disputed bills, payment modes, late payment and arrears recovery (pp58–68).
Chapter 8 lays down separate procedures for theft and unauthorised use of electricity, including inspection, show-cause and hearing, provisional and final assessment, compounding, appeals, preventive measures and reporting (pp69–81). Chapter 9 covers temporary and permanent disconnection, disconnection at consumer request, and reconnection (pp82–85). Chapter 10 contains general provisions on reporting, parallel licensees, power factor and harmonics, failure of supply, approval of schedules of charges, load shedding, service of notice, demand-side management, consistency of licensee terms, exemptions, repeal of the 2005 Code and removal of difficulties (pp86–92). Chapter 11 contains the annexures: application and declaration forms, connection and load-change forms, test reports, meter complaint/testing formats, disconnection formats, security-deposit methodology, the theft assessment formula and general conditions of supply (pp93–120).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 22 Apr 2015Public notice: Draft Electricity Supply Code and Other Conditions of Supply Regulations, 2015 — Public Notice Inviting Comments
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.