Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Draft Electricity Supply Code and Other Conditions of Supply Regulations, 2015 — Public Notice Inviting Comments

INVITING COMMENTS ON DRAFT ELECTRICITY SUPPLY CODE REGULATIONS, 2015

Public notice on a draftDated 22 Apr 2015Advertisement No. 02/2015-16 dated 22nd April, 2015

Draft

Voltaic holds no final regulation made from this draft.

Public notice on the Electricity Supply Code and Other Conditions of Supply Regulations, 2015 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a single-page public notice by the Maharashtra Electricity Regulatory Commission announcing that it has prepared draft Electricity Supply Code and Other Conditions of Supply Regulations, 2015, framed under Section 181 and other relevant provisions of the Electricity Act, 2003 (p1). It states that the proposed regulations would supersede the earlier 2005 regulations (p1).

The notice's operative purpose is consultation: the draft is not attached but is said to be available in downloadable format on the Commission's two websites (p1). The Commission invites written comments, suggestions and objections, to be sent in six copies (1+5) to the Secretary, MERC at its Mumbai address, in person or by post, or by fax or e-mail (p1).

It sets a single deadline — submissions received on or before 22 May 2015 will be considered before the draft regulations are finalised (p1). The notice is dated 22 April 2015 at Mumbai and signed by the Secretary (p1). For an analyst, it is a consultation-stage marker, not the operative supply code: it fixes who may comment, how, and by when.

Standard name
Electricity Supply Code

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document