RERC · Rajasthan Electricity Regulatory Commission
Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources (First Amendment) Regulations, 2020
Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) (First Amendment) Regulations, 2020
AmendmentDated 28 Jan 2020No. RERC/Secy./Regulation -134 dated January 28, 2020
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Rajasthan Electricity Regulatory Commission's first amendment to its principal regulations on forecasting, scheduling and deviation settlement for solar and wind generation sources in the State (p2). It is a short, surgical instrument rather than a fresh framework.
Regulation 3(1) and 3(2) are widened so that captive consumption through open access routed "through a trader" is brought within the parent regulation's scope (p2). Regulation 7 is rewritten to remove the generator's choice of leaning on the SLDC's forecast: the QCA or the wind/solar generator must now give the SLDC a schedule built on its own forecast, considering all available data (p2). The alternative reference to "SLDC's forecast" in regulation 16 is struck out, and regulation 20 is deleted outright (p2).
It comes into force on publication in the official gazette, but no gazette date is printed (p2). Page 1 — which would carry the preamble and any statement of reasons.
Read with this
The regulation
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.