Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2017

Rajasthan Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2017

RegulationDated 14 Sep 2017No. RERC/Secy./Regulation - 121 dated 14th September, 2017

1 amendment to it is on Voltaic, dated 28 Jan 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is RERC's principal regulation for integrating solar and wind generation into the Rajasthan grid. It sets how these generators forecast and schedule their output, how deviations from schedule are measured and commercially settled, and it creates the Qualified Coordinating Agency (QCA) and the State Pool Account as the plumbing for that settlement. Made under Section 181 of the Electricity Act 2003 and issued as Notification No. RERC/Secy./Regulation-121 dated 14 September 2017, it comes into force on gazette publication, with the commercial mechanism deferred to 1 January 2018 (p1).

Regulations 1–2 carry the short title, commencement and the definitions that do the real work — Absolute Error, Available Capacity, Deviation, Gaming, Pooling Station, QCA, State Pool Account and the 15-minute time-block (p1–4). Part 1 (Reg 3) fixes applicability at 5 MW, whether the generator is that size alone or sits behind a pooling station or solar park of that size, and routes regional entities to the CERC DSM Regulations, 2014 (p4–5).

Part 2 (Regs 4–10) makes the QCA the single point of contact with SLDC for scheduling, metering coordination, commercial settlement and de-pooling, and lays out the forecasting and scheduling process: day-ahead schedules in 15-minute blocks, the option of using SLDC's own forecast, aggregated schedules at pooling station level, and the limits on intra-day revision (p5–7). Part 3 (Regs 11–13) covers interface metering, telemetry and data communication, leaving formats and the detailed plan to an SLDC Detailed Procedure approved by the Commission (p7).

Part 4 (Regs 14–23) is the commercial core. Generators selling within the State are paid on actual energy while those selling outside are paid on scheduled generation (p8). Deviation charges for over- or under-injection within the State are set out band-wise by absolute error in Table I (p8); outside-State sale is settled under the Appendix framework at a Fixed Rate derived from the PPA or, for open access and captive plants, APPC (p11–12). Settlement is monthly, at pooling station level, through the State Pool Account maintained by SLDC, with solar and wind treated as a virtual pool and SLDC keeping block-wise accounts (p8–9). Part 5 (Regs 24–26) gives the Commission powers to relax, direct and amend (p9–10).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document