MPERC · Madhya Pradesh Electricity Regulatory Commission
Generation Tariff Regulations, 2024
Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for determination of Generation Tariff) Regulations, 2024 {RG-26 (V) of 2024}
Regulation · Gazette copyDated 27 Jun 2024In force from 1 Apr 2024MPERC/2024/1552 dated 27th June 2024
The Gazette copy of the Generation Tariff Regulations, 2024.
Summary
Summary written by software, from pages 1 to 151 of 355. Check the regulator's original before you rely on it.
The Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for determination of Generation Tariff) Regulations, 2024 — RG-26(V) of 2024, Notification No. MPERC/2024/1552 — reset the Commission's cost-plus (Section 62) generation-tariff framework for a five-year control period running 1 April 2024 to 31 March 2029. The preamble (p119) explains the exercise: the earlier revision, RG-26(IV) of 2020, covered FY 2019-20 to FY 2023-24, and the Commission is now aligning its control period with the one notified by CERC.
Chapter 1 (p119–127) is preliminary. Regulation 1 gives the short title, extends the Regulations to the whole of Madhya Pradesh and brings them into force from 01.04.2024 for five years, with a proviso that tariff up to 31.03.2024 for stations already in commercial operation but not yet finally determined is settled under the 2020 Regulations. Regulation 2 sets the scope: all Section 62 read with Section 86 tariff determinations for generating stations other than renewables, excluding projects whose tariff was discovered through competitive bidding and adopted under Section 63. It lists the categories that remain under cost-plus determination — state-owned identified developers, expansion of existing stations (for private developers restricted to a one-time addition of not more than 100% of existing capacity), projects under any State Government policy tied to the State distribution licensee capped at 35% of installed capacity, hydro and pumped storage projects, hydro above 100 MW design capacity awarded before 28.01.2016, and coal-washery-reject stations of State PSUs or qualifying joint ventures (non-government shareholding capped at 26%) — and makes competitive bidding mandatory for other new stations whose PPAs were executed after 05.01.2011. Regulation 3 defines the vocabulary used throughout, from additional capitalisation and admitted capital cost to change in law, force majeure, GCV as received and de-commissioning.
Regulation 18.3 lists what an existing project's capital cost includes; 18.4 adds hydro-specific items; 18.5 handles projects acquired through NCLT insolvency proceedings; 18.6 lists exclusions. Regulation 19 sets the prudence-check principles. Regulation 20 covers interest during construction and incidental expenditure during construction and how delay in achieving COD is treated. Regulation 21 separates controllable from uncontrollable factors. Regulation 22 caps initial spares. Chapter 5 (p151) begins the rules on additional capitalisation within the original scope up to the cut-off date.
Read with this
The regulation
- Dated 27 Jun 2024Generation Tariff Regulations, 2024
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.