WBERC · West Bengal Electricity Regulatory Commission
Deviation Settlement Mechanism and Related Matters Regulations, 2021 — Corrigendum, 2022
CORRIGENDUM to the West Bengal Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2021
CorrigendumDated 13 Jan 2022Published in the Gazette 18 Jan 2022No. Regu-66/WBERC(Corrigendum) dated 13.01.2022
Corrects the West Bengal Deviation Settlement Mechanism and Related Matters Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A one-page corrigendum (p1) by the West Bengal Electricity Regulatory Commission to the WBERC (Deviation Settlement Mechanism and related matters) Regulations, 2021, which were notified under No 73/WBERC dated 26.11.2021 and published in the Kolkata Gazette Extraordinary on 30 November 2021. The Commission states that printing errors had been detected creating a possibility of misinterpretation, and it corrects one of them.
The correction targets the table in regulation 3.3.10 on page 12 of the principal regulations, which sets the deviation limit for a sign-change violation by schedule size. The erroneous text used strict 'greater than' thresholds for the band boundaries; the corrected version makes them 'greater than or equal to'. So a schedule of exactly 1000 MW, 500 MW, 20 MW or 10 MW now falls in the higher band. The MW bands and the CERC-derived limit values are untouched — only the inequality signs change.
No commencement clause is given and the parent regulations' scope is not restated.
Read with this
The regulation
Commencement notices and reasons
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.