West Bengal Deviation Settlement Mechanism and Related Matters Regulations, 2021
West Bengal Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2021
RegulationDated 26 Nov 2021Published in the Gazette 30 Nov 2021In force from 3 Jan 2022No. 73/WBERC dated 26.11.2021
Summary
Summary written by software. Check the regulator's original before you rely on it.
The WBERC (Deviation Settlement Mechanism and related matters) Regulations, 2021, notified as No. 73/WBERC dated 26.11.2021 and published in the Kolkata Gazette on 30 November 2021 (p1), set up the State's deviation settlement framework for intra-State grid users. They come into force on 3 January 2022, the effective date after Gazette publication, with the erstwhile UI mechanism continuing until the day before (p1).
Chapter 1 gives the short title, extent, commencement and applicability, and directs SLDC to complete software and pool-accounting arrangements before the effective date (p1). Chapter 2 defines the operative terms and links DSM to the State Grid Code, Tariff Regulations, Balancing and Settlement Code and Open Access Regulations; it states the grid-discipline objective and confines scope to scheduled transactions through short-, medium- and long-term open access (p2-5).
Chapter 3 is the substantive core. It specifies which entities are inside or outside DSM - InSTS-connected generators, embedded generators, distribution licensees, open access customers, captive plants and energy storage systems - and the conditions for inclusion, including meter and communication requirements (p6-8). It lays down the time-block method for computing deviation, the frequency-linked charge basis, caps and zero-charge bands, additional charges for exceeding volume limits, daily deviation limits, sign-change obligations and penalties, and special treatment for gaming, captive generation, open access consumers and embedded stations (p8-15).
Chapter 4 provides the disbursement procedure: weekly deviation settlement accounts, payment through SLDC-DS-FUND-WBSETCL, billing, and dispute referral (p16). Chapter 5 covers metering, infirm power tariff, the renamed fund, SLDC reporting, Commission powers to intervene, amend, relax and issue practice directions, dispute resolution, substitution of 'UI'/'unscheduled interchange' in four WBERC regulations, and repeal with savings of specified Tariff Regulations provisions (p17-18). Schedules I and II provide additional-charge tables by deviation band and frequency condition (p19-21); Schedule III fixes spot frequencies, sign-change parameters, infirm-power prices, cap rate and daily-deviation adders (p22).
Read with this
Amendments and corrections
Commencement notices and reasons
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.