APERC · Andhra Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2012
APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2012 (Regulation No. 1 of 2012)
RegulationDated 21 Mar 2012Published in the Gazette 21 Mar 2012In force from 1 Apr 2012Regulation No. 1 of 2012 dated 21-03-2012
Replaced by RPPO Regulations, 2017
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Andhra Pradesh Electricity Regulatory Commission made these regulations under sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003, after a public hearing on 12 January 2012. They were published in the Andhra Pradesh Gazette (Part-II Extraordinary) on 21 March 2012, come into force on 1 April 2012, and apply throughout Andhra Pradesh (p1).
Clause 1 gives the short title, commencement and territorial application; clause 2 defines the working vocabulary — Act, Central Agency, Central Commission, Certificate (REC), floor price, forbearance price, obligated entity, open access consumer, pooled cost of power purchase, power exchange, renewable energy sources, State Agency, year, RPPO and RESCO (p1–4).
Clause 3 is the operative core. It imposes the renewable power purchase obligation on three classes of obligated entity — distribution licensees, open access consumers, and consumers owning a captive generating plant of one MW installed capacity — measured as a minimum share of each entity's energy consumption over the years 2012-13 to 2016-17, with a solar sub-obligation and with purchase of RECs counting as compliance. It also deals with carrying forward existing renewable purchases, counting inter-DISCOM purchases, folding RESCO consumption into the licensee's consumption (with no separate RESCO obligation), protecting existing consented PPAs, and the Commission's power to revise the targets for any year (p4–9).
Clause 4 subjects REC procurement to Commission directions and requires obligated entities to deposit RECs with the State Agency. Clause 5 sets out the State Agency's role, quarterly compliance reporting in a Commission-stipulated format, remuneration fixed by the Commission, and replacement of the agency by order if it performs unsatisfactorily (p9–10).
Clause 6 gives the eligibility and accreditation conditions for renewable generators, including captive power producers, seeking RECs, with notes on the pooled cost of power purchase cycle and on the transmission/wheeling/duty benefits that disqualify a CPP (p10–12). Clause 7 provides the consequences of default — a deposit into a fund maintained by the State Agency computed on the shortfall and the forbearance price, use of that fund to buy certificates, and penalty under section 142 of the Act (p12). Clause 8 repeals the 2009 RPPO order and its 2010 amendment, with savings for past actions and settlement of rights and liabilities under the old framework; clauses 9 and 10 give the Commission power to remove difficulties and preserve its general procedural powers (p12–14).
Read with this
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.