APERC · Andhra Pradesh Electricity Regulatory Commission
RPPO Regulations, 2017
Reg. No. 1 of 2017 RPPO Regulations
RegulationDated 31 Mar 2017Published in the Gazette 31 Mar 2017Regulation No. 1 of 2017 dated 31-03-2017
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The text available for this instrument consists only of the opening notification page and the signature page of APERC Regulation No. 1 of 2017, dated 31 March 2017 (p1, p13). The preamble states that APERC makes the regulations under Sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 to prescribe an obligation to purchase renewable power and compliance through purchase of renewable energy or renewable energy certificates (p1). The notification is published in the Andhra Pradesh Gazette Extraordinary as No.140, Amaravati, 31 March 2017, G.1154 (p1). Page 13 carries the Commission Secretary (i/c) signature at Hyderabad, dated 31-03-2017. A senior analyst should treat this excerpt as cover-and-authentication only and obtain the full regulation.
Read with this
Commencement notices and reasons
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.