Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

RPPO Regulations, 2017

Reg. No. 1 of 2017 RPPO Regulations

RegulationDated 31 Mar 2017Published in the Gazette 31 Mar 2017Regulation No. 1 of 2017 dated 31-03-2017

Replaced by Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The text available for this instrument consists only of the opening notification page and the signature page of APERC Regulation No. 1 of 2017, dated 31 March 2017 (p1, p13). The preamble states that APERC makes the regulations under Sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 to prescribe an obligation to purchase renewable power and compliance through purchase of renewable energy or renewable energy certificates (p1). The notification is published in the Andhra Pradesh Gazette Extraordinary as No.140, Amaravati, 31 March 2017, G.1154 (p1). Page 13 carries the Commission Secretary (i/c) signature at Hyderabad, dated 31-03-2017. A senior analyst should treat this excerpt as cover-and-authentication only and obtain the full regulation.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document