Skip to content

MERC · Maharashtra Electricity Regulatory Commission

RE Tariff Regulations, 2010

Maharashtra Electricity Regulatory Commission (Terms and Conditions for determination of RE Tariff) Regulations, 2010

RegulationDate not statedNo.MERC/Legal/2010/482/

Replaced by Renewable Energy Tariff Regulations, 2015

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are MERC's 2010 principal regulations for determining tariffs for renewable energy projects in Maharashtra, made under ss.61, 66, 86 read with s.181 of the Electricity Act, 2003 (p2). The Regulations begin with definitions and scope (pp2–7). They apply to new RE projects commissioned in Maharashtra after notification and selling to distribution licensees where tariff is determined under s.62 read with s.86; existing projects continue under their respective RE tariff orders (pp5–6). Eligible entities are specified technology-wise: wind sites with WPD of at least 200 Watt/m2 at 50 m hub height, small hydro up to 25 MW, mini/micro hydro up to 1 MW, biomass, qualifying non-fossil fuel cogeneration where useful power plus half useful thermal exceeds 45% of facility energy consumption, solar PV/thermal, solar rooftop and municipal waste technologies approved by MNRE (pp6–7).

Chapter 1 sets the five-year control period from notification to FY 2014-15 and the tariff periods, project-specific tariff categories, petition requirements, tariff structure and despatch principles, including must-run status for most RE except biomass and cogeneration (pp8–10). Chapter 2 sets financial principles: capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, rebates, late payment surcharge, CDM benefit sharing, subsidies and taxes (pp11–14). Chapters 3–8 provide technology-specific parameters for wind, small hydro, biomass, non-fossil fuel cogeneration, solar PV and solar thermal (pp14–25), with capital cost indexation largely tied to CERC notifications and fuel price indexation for biomass and bagasse. Chapter 9 gives deviation, relaxation, amendment and difficulty-removal powers (p25). Appended forms and schedule templates support tariff petitions and MEDA monthly fuel reporting (pp27–31, 34).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document