Renewable Energy Tariff Regulations, 2015

Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015

RegulationDated 10 Nov 2015No. MERC/Legal/2015/0333 dated 10th November 2015

Replaced by Renewable Energy Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015, made by the Maharashtra Electricity Regulatory Commission under Sections 61, 66 and 86 read with Section 181 of the Electricity Act, 2003 (p30). It is a principal tariff regulation for renewable energy projects in Maharashtra. The English operative text begins at p30, runs through p48, and is followed by the Secretary's signature at p56; pp16-29 contain Marathi text that mirrors portions of the biomass and co-generation chapters and the Marathi signature page.

Regulations 1-2 cover short title, commencement from Gazette publication, and definitions (p30-33). Regulation 3 applies the norms to new RE projects commissioned in Maharashtra and selling to distribution licensees, while preserving existing RE projects under earlier RE Tariff Orders and the 2010 MERC Tariff Regulations (p34). Regulation 4 imposes quarterly reporting on distribution licensees (p34).

Chapter 1 (Regs 5-12) sets general principles: competitive bidding under Section 63, the five-year Review Period to FY2019-20, tariff periods by technology, project-specific tariff routes, petition procedure, tariff structure and design, and must-run despatch (p34-36). Chapter 2 (Regs 13-25) lays down common financial norms for capital cost, debt-equity, loans, depreciation, return on equity, working capital, O&M, rebate, late payment surcharge, reactive energy charges, subsidies and taxes (p37-39).

Chapters 3-8 provide technology-specific parameters: wind (p39-40), small hydro (p40-41), biomass (p41-43), non-fossil co-generation (p43-46), solar PV (p46-47) and solar thermal (p47-48). These cover capital cost and indexation, CUF/PLF, auxiliary consumption, station heat rate, O&M, fuel mix, biomass/bagasse fuel price indexation, fossil-fuel use limits, compliance monitoring and co-generation energy audit. The closing regulations (78-82) provide for deviation, power to relax, orders and practice directions, amendment and removal of difficulties (p47-48). Annexure-A forms and Annexure-B reporting templates are referenced (p35, p43, p46).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Amendments and corrections

7 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text, 2 copies in another language, 1 amendment not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗