MSERC · Meghalaya State Electricity Regulatory Commission
Deviation Settlement Mechanism and related matters Regulations, 2018 — First Amendment, 2018 — Draft
Meghalaya State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (First Amendment) Regulations 2018
Draft amendmentDated 31 Oct 2022MSERC/REGULATIONS/DSM-2018/2022/164 dated 31st October 2022
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a pre-publication notification dated 31 October 2022 by which the Meghalaya State Electricity Regulatory Commission proposes the First Amendment to its Deviation Settlement Mechanism (DSM) Regulations, 2018, originally issued on 5 November 2018. It is a draft: the Commission invites suggestions within 21 days of the notice before publishing the amendment (p1). Once gazetted, the amendment tightens grid-discipline rules for buyers and sellers in Meghalaya by shortening the deviation-settlement cycle, moving the frequency thresholds at which additional charges bite (from 49.70 Hz to 49.90 Hz), and adding a daily cumulative-deviation limit.
Regulation 1 sets commencement in two stages: everything except the commercial arrangements, deviation charges and penalties takes effect from the date of notification in the Meghalaya Gazette, while clauses 9 and 10 and the related charges and penal actions follow six months later (p1–2).
Regulations 2 and 3 rework the time-block and sign-change architecture of the parent Regulation 6(G) and Regulation 9: the substitution cycle is halved, a change in the sign of deviation becomes mandatory, under-drawal and over-injection charges are set to zero in the interest of grid security, and certified transmission outages are carved out with compensation at the lower or higher of power purchase cost and deviation charge (p2). Regulation 9(A)(8) fixes fuel-wise ceiling rates for infirm power injected during testing before COD and limits the period for which that rate is payable (p3).
Regulation 4 rewrites the whole of Regulation 10 — frequency thresholds, permissible deviation bands, additional charges for over-drawal/under-injection and over-injection/under-drawal, treatment of CERC-regulated stations burning imported coal, lignite or APM gas, and a tiered penalty for repeated failure to change sign, with a worked illustration (p3–5).
Regulations 5 and 6 make consequential changes to the frequency references in Regulations 11 and 12 (p6). Regulation 7 inserts new clauses 16(1) and 16(2): a daily cap on total deviation in energy terms for drawee entities and generators with an additional charge for breach, and a residual fallback to the MSERC 2018 Regulations or the CERC DSM Regulations, 2014 for matters not covered (p6).
Read with this
The regulation
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.