MSERC · Meghalaya State Electricity Regulatory Commission
Deviation Settlement Mechanism and Related Matters Regulations, 2018
Meghalaya State Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2018
RegulationDated 5 Nov 2018MSERC/REGULATIONS/DSM/2018/03- dated 5 th November 2018
Replaced by Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MSERC's principal deviation-settlement regulation, dated 5 November 2018 (p1). It creates a state-level framework to maintain grid discipline for intra-state open-access transactions through commercial settlement of deviations. Regulations 1–2 provide commencement staging and definitions for sellers, buyers, deviation, State Entity, State Deviation Pool Account, time-block and open-access categories (p1–3). Regulation 3 states the grid-discipline objective; Regulation 4 gives applicability, covering sellers including open-access and captive generators but excluding in-situ captive and wind/solar, and buyers including distribution licensees, deemed licensees and full open-access consumers on the intra-State transmission system; partial open-access and distribution-network open-access consumers are routed to the 2012 Open Access Regulations (p3–4). Regulation 5 lists SLDC and State Entity duties, connection/open-access agreements and metering requirements (p4). Regulation 6 sets the DSM design parameters: scheduling period, day-ahead despatch, frequency operating range, settlement period, units of account, price vector following CERC DSM 2014, deviation volume limits and loss allocation (p4–6). Regulation 7 deals with capacity declaration and scheduling; Regulation 8 with gaming; Regulation 9 with charges for deviation, caps and zero-charge conditions; Regulation 10 with volume limits and additional charges; Regulation 11 with infirm and start-up power before COD; Regulation 12 with SLDC procedures; Regulation 13 with the State Energy Account; Regulation 14 with compliance with SLDC instructions; Regulation 15 with the State Deviation Pool Account and appropriation; Regulation 16 with payment timelines and letter-of-credit security; Regulation 17 with the State Power Committee (p6–14). Regulations 18–21 give the Commission powers to amend, remove difficulties, relax and issue directions (p14). Annexure-I contains the frequency-linked deviation price vector (p15–16); Annexure-II Table I is for additional deviation charges.
Read with this
Proposed changes (drafts with no final yet)
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.