Uttarakhand Electricity Regulatory Commission (Green Energy Open Access) Regulations, 2023
RegulationDated 18 Oct 2023No. F-9 (35)/RG/UERC/2023/779 dated 18th October, 2023
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is UERC's principal regulation creating a green-energy open access regime in Uttarakhand, notified on 18 October 2023 under s.181 read with ss.39, 40, 42 and 86 of the Electricity Act (p1). It comes into force on Gazette publication, but the Gazette date is not printed (p1).
Regulation 3 confines the regime to connectivity and open access on the intra-State transmission system, the distribution system, or both, including use in conjunction with the inter-State system, and routes anything not expressly covered to the 2015 Intra-State Open Access Regulations, the 2018 RE tariff regulations and the 2017 DSM Regulations (p4). Regulation 4 sets the entry threshold — 100 kW of contracted demand or sanctioned load, via a single connection or multiple connections of the same consumer in one division — with no cap for captive consumers and RE generators, and requires the customer to hold its schedule for at least 12 time blocks a day, deviations being charged under the DSM Regulations (p4–5).
SLDC is nodal agency for short-term and the STU for medium- and long-term access (p5). Regulation 6 sets the application route through the Central Nodal Agency's GOAR Portal, SLDC scrutiny and processing timelines, deemed approval, first-in-first-out queuing, spare-capacity rules and augmentation for long-term access, priority for non-fossil sources, a hearing requirement before refusal, and appeals to the Commission (p5–6). Regulation 7 applies CEA metering regulations and the State MCDAR (p6).
Regulation 8 lists the charges leviable — transmission, wheeling, cross-subsidy surcharge, standby, banking, and fees/scheduling/deviation/reactive charges — points their methodology to the 2015 Regulations and imposes a series of exemptions from cross-subsidy and additional surcharge, including captive use, embedded consumers, waste-to-energy, green hydrogen and ammonia, and offshore wind (p6–8). Regulation 9 creates a banking facility with in-kind charges, a per-billing-cycle window and lapse of unused credit, and requires the distribution licensee to issue a banking procedure and model agreement (p8–9). The remaining regulations cover energy losses, compliance with the grid and supply codes, a curtailment priority order favouring green energy within each term category, and the Commission's powers to relax, amend and remove difficulties (p9–10).
No annexures, formats or schedules are attached; the application format, fees and bank guarantees are left to a procedure to be prepared by the nodal agency within 30 days of notification (p5).
Read with this
Commencement notices and reasons
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.