Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Green Energy Open Access Regulations, 2023 — Statement of Reasons

Uttarakhand Electricity Regulatory Commission (Green Energy Open Access) Regulations, 2023 — Statement of Reasons (SOR)

Statement of reasonsDate not stated

The commission's reasons for the Green Energy Open Access Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SOR) issued by the Uttarakhand Electricity Regulatory Commission to explain the finalisation of the UERC (Green Energy Open Access) Regulations, 2023. It is not the notified regulation text; it records the consultation process and the Commission's decisions on draft provisions. Page 1 sets out the trigger: the Ministry of Power's Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, as amended, directed State Commissions to frame or align green energy open access regulations; the Commission also relied on the Forum of Regulators model on open access charges and banking. The draft was circulated, eight stakeholders responded, and their list is Annexure-I (p1, p26).

Pages 2–25 are a clause-by-clause consultation record. For definitions (Reg 2), the Commission refuses separate definitions of 'banking cycle' and 'banked energy', retains the broad 'green energy open access customer' definition covering consumers, traders, distribution licensees and generating companies, updates the IEGC reference to the CERC 2023 Grid Code, and later adds a definition of 'non-peak hours' (p2–4, p22). For eligibility (Reg 4), it clarifies aggregation of multiple connections in the same consumer's name in the same electricity division and preserves the 100 kW threshold, with no limit for captive consumers and RE generators; it also recasts the schedule-maintenance and DSM-deviation proviso (p5–7). For nodal agency (Reg 5), SLDC handles short-term and STU medium/long-term grants (p7–8). For procedure (Reg 6), it accepts deemed approval if the nodal agency misses the timeline, adds GOAR-portal and first-in-first-out processing provisions, and keeps appeals to the Commission (p8–11). For metering (Reg 7), ABT meters remain mandatory for energy accounting (p11–12). For charges (Reg 8), the SOR lists charge heads and refers methodology to the 2015 intra-state open access regulations; it retains the 12-year cross-subsidy-surcharge cap, retains standby charges, and exempts embedded consumers opting for GEOA from additional surcharge (p12–16). For banking (Reg 9), it settles on billing-cycle banking, TOD-based peak/non-peak adjustments, lapsed unutilised banked energy with REC entitlement, and shifts energy accounts to the distribution licensee with weekly reporting to SLDC (p16–23). For losses (Reg 10), pooled rather than voltage-wise losses continue because of data gaps (p23–24). For curtailment (Reg 12), green energy open access gets priority over conventional OA within each term category, pro-rata within green category, and distribution licensees are curtailed last (p24–25).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access charges, Energy banking

Read with this

The regulation

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document