Skip to content

KERC · Karnataka Electricity Regulatory Commission

Merit Order Despatch and Optimization of Power Purchase Cost Regulations, 2024

Karnataka Electricity Regulatory Commission (Merit Order Despatch and Optimization of Power Purchase Cost) Regulations, 2024

Regulation · Gazette copyDated 24 Jun 2024KERC/OP06/2024/250 dated 24.06.2024

The Gazette copy of the Merit Order Despatch and Optimization of Power Purchase Cost Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Karnataka Electricity Regulatory Commission's (Merit Order Despatch and Optimization of Power Purchase Cost) Regulations, 2024 lay down how electricity available to Karnataka's distribution licensees is ranked, scheduled and backed down so that power is bought at least cost. The document opens with the Commission's approval Order of 24.06.2024, recording KPCL's petition OP 06/2021, the 06.03.2023 public hearing on the 2022 draft, and the decision to notify the Regulations (pp2–3).

The Regulations themselves, numbered KERC/OP06/2024/250 and also dated 24.06.2024, begin at p4. Regulation 1 names them and brings them into force on Gazette publication; Regulation 2 defines 33 terms — merit order despatch, MOD Stack, must-run plants, declared capacity (on-bar and off-bar), start-up classes, technical minimum, variable charges — and defers to IEGC/CERC meanings elsewhere (pp4–8). Regulation 3 extends them to SLDC, all distribution licensees and generating companies, including captive plants selling to licensees (p8).

The operative core is Regulations 4–11. Regulation 4 sets how the MOD stack is built from verified variable charges plus inter-state transmission losses and AC-UBC charges (pp8–10). Regulation 5 fixes the twice-monthly data cycle from generator to licensee to SLDC and the fortnightly effective periods of the published stack (pp10–11). Regulation 6 gives the least-cost despatch principles: demand forecasting, cost minimisation, curtailment avoidance, spinning-reserve adequacy, market options, and curtailment of must-run renewables where justified (pp11–14). Regulations 7–10 cover capacity declaration and ramp rates, monitoring of mis-declaration and gaming, zero scheduling of costlier contracted sources, and unit shutdown and revival procedure, including start-class time limits (pp14–19). Regulation 11 sets technical-minimum operation for intra-state stations, with compensation deferred to later Commission orders (p19). Regulations 12–16 give the Commission powers to amend, relax, remove difficulties and issue practice directions, and repeal earlier merit-order instruments with savings (pp19–20). Annexures 1 and 2 are the MOD stack and backing-down report formats (p21).

Primary topics
Scheduling and despatch, Power procurement and PPAs, Congestion and curtailment

Read with this

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document