CERC · Central Electricity Regulatory Commission
Deviation Settlement Mechanism and Related Matters Regulations, 2021
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2021
Draft regulationDated 7 Sep 2021No. L-1/260/2021/CERC dated 07.09.2021
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission's (Deviation Settlement Mechanism and Related Matters) Regulations, 2021 (No. L-1/260/2021/CERC, dated 7 September 2021) replace the 2014 DSM framework with a mechanism that prices deviation from schedule and funds ancillary services out of the same pool (p1, p8). The Commission states the regulations were made after previous publication, but they come into force only on a date to be notified separately — the text fixes no operative date (p1).
Regulations 1–4 set the title, the objective of deterring deviation for grid security, the definitions, and the scope: all grid-connected regional entities and other entities engaged in inter-State purchase and sale of electricity (p1–3). Regulation 5 obliges entities to adhere to schedule, with deviation to be managed by the Load Despatch Centre under the Ancillary Services Regulations. Regulation 6 gives the deviation formulae in MWh and percentage, separately for general sellers, wind/solar (WS) sellers and buyers, with WS sellers' percentage measured against available capacity rather than schedule (p4).
Regulation 7 derives the normal rate of deviation charges from the weighted average ancillary service charge, with a one-year transitional proviso taking the highest of Day Ahead Market ACP, Real Time Market ACP and the weighted average ancillary service charge across regions, plus a fallback where ACP is unavailable (p4). Regulation 8 bands the charges by entity type and deviation band — general sellers, WS sellers, buyers, and buyers in RE-rich States — with zero charge for infirm power injection and the normal rate for start-up power, inter-regional and cross-border deviation (p5–6).
Regulations 9–10 set up the Deviation and Ancillary Service Pool Account: weekly RLDC data to the RPC Secretariat, issue of statements, separate principal and interest books, credit and debit rules covering SRAS and TRAS, cross-regional deficit support and residual recovery through RLDC fees; payment within a fixed number of days, late payment surcharge, and a Letter of Credit requirement for entities that defaulted in the previous financial year (p6–8).
Regulations 11–13 give the Commission power to relax provisions and to remove difficulties, and repeal the 2014 DSM Regulations while saving past actions and renaming the Regional Deviation Pool Account Fund (p8).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 7 Sep 2021Notice extending the date for comments: Draft Deviation Settlement Mechanism and Related Matters Regulations, 2021 — Public Notice Inviting Comments
- Released with the draft dated 7 Sep 2021Explanatory memorandum: Deviation Settlement Mechanism and Related Matters Regulations, 2021 — Explanatory Memorandum
- Dated 8 Oct 2021Notice extending the date for comments: Draft Deviation Settlement Mechanism and Related Matters Regulations, 2021 — comments deadline extension notice
- Dated 2 Nov 2021Hearing notice: Draft Deviation Settlement Mechanism and Related Matters Regulations, 2021 — Public Hearing Notice
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.