Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2021 — Explanatory Memorandum

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2021

Explanatory memorandum to a draftReleased with the draft dated 7 Sep 2021

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the draft Deviation Settlement Mechanism and Related Matters Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

An explanatory memorandum issued by CERC alongside the proposed Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2021. It is not the regulation itself: it explains why the Commission proposes to replace its frequency-linked deviation regime and describes what the replacement would contain.

Part 1 (pp3–7) is a history — the 2002–03 Availability Based Tariff and the Unscheduled Interchange mechanism, the 2012 grid failures and the Enquiry Committee, the 2014 DSM Regulations with their volume limits and additional deviation charges, and the first five amendments. It closes with the four shortcomings the Commission wants to fix: no value-of-lost-load signal, flat peak and off-peak prices, no transmission or congestion component, and DSM prices sitting below power-exchange prices.

Part 2 (pp7–10) sets out the two rationales: the narrowed operating band and the arrival of ancillary services have made frequency a poor indicator of generation shortfall, and DSM rates should be indexed to what it costs to compensate deviation through ancillary services rather than to frequency.

Part 3 (pp10–17) describes the proposed design — schedule adherence with deviations managed centrally by the system operator; deviation formulae for general sellers, wind and solar sellers, and buyers; the normal rate of deviation charge with a transitional formula for at least a year; category-specific treatment for general generators, run-of-river hydro, municipal solid waste and wind and solar generators; buyer over-drawal limits and penal rates; infirm and start-up power, inter-regional and cross-border deviation; and the receipts and payments of the new Deviation and Ancillary Service Pool Account.

Parts 4 and 5 (pp17–18) cover power to relax and remove difficulty, and repeal of the 2014 DSM Regulations with savings and renaming of the Regional Deviation Pool Account Fund.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Ancillary services and reserves, Scheduling and despatch

Read with this

Voltaic holds no final regulation made from this draft.

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document