Skip to content

CERC · Central Electricity Regulatory Commission

Guidelines for Virtual Power Purchase Agreements — Draft

Guidelines for Virtual Power Purchase Agreements

Draft guidelinesReleased with the notice dated 22 May 2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's draft of a framework for Virtual Power Purchase Agreements (VPPAs) in India (p1). Section 1 sets out why: the Central Government's October 2023 specification, under section 14(n) and (x) of the Energy Conservation Act, 2001, of minimum non-fossil consumption shares for Designated Consumers — the Renewable Energy Consumption Obligation (RCO) — with shortfalls penalised, and VPPAs proposed as a further instrument for meeting it. It records SEBI's 31 January 2025 opinion that VPPAs are bilateral, non-tradable over-the-counter contracts falling outside the Securities Contracts Regulation Act and therefore within CERC's jurisdiction, and the Ministry of Power's 3 March 2025 request that CERC build an NTSD-based OTC framework (p1).

Sections 2 and 3 give the short title, provide for effect from gazette notification, apply the guidelines to parties entering VPPAs, and describe their scope as setting out the statutory framework (p2). Section 4 defines Commission, Consumer, Designated Consumer, OTC contracts and platforms, Power Exchange, PMR 2021, REC Regulations and Trader, and defines a VPPA as an NTSD OTC contract between a consumer or Designated Consumer and an RE generator in which the consumer guarantees the mutually agreed VPPA price for the whole contract term while the generator sells the electricity through power exchange or another authorised mode, the price difference being settled bilaterally (p2–3).

Sections 5 to 8 cover the mechanics: how a VPPA may be entered (directly, through a trader, or by listing on a CERC-registered OTC platform), project registration under the REC Regulations 2022, sale of the electricity component in the DAM and/or RTM segments or another authorised mode, transfer of the resulting RECs to the consumer for RCO compliance or green-attribute claims, extinguishment of those RECs at the registry on communication of receipt, non-tradability and non-transferability, and bilateral settlement of the VPPA-price/market-price difference. Section 9 leaves disputes to mutual settlement under the contract (p3–4). No gazette date is printed.

Standard name
Power Market Regulations, REC Regulations
Primary topics
Power markets and exchanges, Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO)

Read with this

The regulation

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document