RERC · Rajasthan Electricity Regulatory Commission
Rajasthan Deviation Settlement Mechanism (First Amendment) Regulations, 2019
Rajasthan Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (First Amendment) Regulations, 2019
AmendmentDated 5 Mar 2019No. RERC/Reg. No. 130 dated March 05, 2019
Amends the Deviation Settlement Mechanism and Related Matters Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Notification No. RERC/Reg. No. 130, dated Jaipur 5 March 2019, is the Rajasthan Electricity Regulatory Commission's first amendment to its Deviation Settlement Mechanism (DSM) Regulations. It is a short operative instrument — five clauses revising an existing framework rather than a standalone regime — and takes effect on publication in the official gazette, a date the text does not print (p1).
Clause 2 rewrites the definition of 'Time-Block' so that it tracks the CERC (Indian Electricity Grid Code) Regulations, 2010 as amended from time to time (p1). Clause 3 replaces the first two provisos of regulation 5(1) with three: a cap on deviation charges for generating stations whose tariff the Commission determines, pegged to their own energy charges as billed for the previous month; a bar on retrospective revision of DSM accounts even if energy charges are later revised; and a single fixed Cap Rate for all other stations irrespective of fuel source (p1).
Clause 4 is the operational core. It moves the frequency reference in the DSM price bands from 49.70 Hz to 49.85 Hz throughout regulation 6, inserts a new sub-regulation 6(2a) limiting aggregate daily deviation as a percentage of schedule for drawees and for generators and attaching an additional charge, and substitutes sub-regulation 6(6) to require any entity deviating persistently in one direction to change the sign of its deviation, with an additional charge for violation (p2). Both new obligations are left to be brought into force by separate Commission orders, as is the sign-change methodology. The clause also deletes the first proviso of 6(3), removes the reference to Table-II, substitutes the proviso to 6(5), and carries the frequency change through 6(9) (p2).
Clause 5 revises the under-injection charge bands in rows 4–6 of Table-I of the Schedule under both the '12% of schedule ≤ 75 MW' and 'more than 75 MW' limbs, and deletes Table-II from the Schedule altogether (p3).
Read with this
The regulation
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.