Rajasthan Deviation Settlement Mechanism (First Amendment) Regulations, 2019

Rajasthan Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (First Amendment) Regulations, 2019

AmendmentDated 5 Mar 2019No. RERC/Reg. No. 130 dated March 05, 2019

Amends the Deviation Settlement Mechanism and Related Matters Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Notification No. RERC/Reg. No. 130, dated Jaipur 5 March 2019, is the Rajasthan Electricity Regulatory Commission's first amendment to its Deviation Settlement Mechanism (DSM) Regulations. It is a short operative instrument — five clauses revising an existing framework rather than a standalone regime — and takes effect on publication in the official gazette, a date the text does not print (p1).

Clause 2 rewrites the definition of 'Time-Block' so that it tracks the CERC (Indian Electricity Grid Code) Regulations, 2010 as amended from time to time (p1). Clause 3 replaces the first two provisos of regulation 5(1) with three: a cap on deviation charges for generating stations whose tariff the Commission determines, pegged to their own energy charges as billed for the previous month; a bar on retrospective revision of DSM accounts even if energy charges are later revised; and a single fixed Cap Rate for all other stations irrespective of fuel source (p1).

Clause 4 is the operational core. It moves the frequency reference in the DSM price bands from 49.70 Hz to 49.85 Hz throughout regulation 6, inserts a new sub-regulation 6(2a) limiting aggregate daily deviation as a percentage of schedule for drawees and for generators and attaching an additional charge, and substitutes sub-regulation 6(6) to require any entity deviating persistently in one direction to change the sign of its deviation, with an additional charge for violation (p2). Both new obligations are left to be brought into force by separate Commission orders, as is the sign-change methodology. The clause also deletes the first proviso of 6(3), removes the reference to Table-II, substitutes the proviso to 6(5), and carries the frequency change through 6(9) (p2).

Clause 5 revises the under-injection charge bands in rows 4–6 of Table-I of the Schedule under both the '12% of schedule ≤ 75 MW' and 'more than 75 MW' limbs, and deletes Table-II from the Schedule altogether (p3).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document