RERC · Rajasthan Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2017

Rajasthan Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2017

RegulationDated 8 Nov 2017In force from 1 Jan 2018No.RERC/Secy/Reg. 122 dated 08th November, 2017

1 amendment to it is on Voltaic, dated 5 Mar 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Rajasthan Electricity Regulatory Commission's principal regulation replacing the intra-state ABT regime with a frequency-linked Deviation Settlement Mechanism (DSM) for Rajasthan. It applies to state generating stations including captive plants above 5 MW and to all distribution licensees (including deemed licensees), with carve-outs for nuclear, run-of-river/irrigation hydro, solar and wind, and for the open-access portion of a station's capacity (p4). Charges are worked out on average time-block frequency at CERC DSM 2014 rates, with caps for coal/lignite/APM-gas stations and zero charges beyond stated over/under-drawal tolerances (pp4-5).

The core is Regulation 6, which sets volume limits as percentages of schedule (or MW), makes over-drawal and under-injection impermissible outside a frequency band, adds Additional Deviation Charges in three frequency zones, and requires net deviation sign reversal every 12 time blocks (pp4-6). SLDC computes and publishes deviation accounts monthly and weekly (p6), while Regulation 9 covers State Energy Accounts, the State Deviation Pool Account Fund and its appropriation waterfall (pp7-8). Regulation 10 sets payment timelines, default interest, Letter of Credit requirements for prior defaulters, and a 15-day verification window (pp8-9). Regulations 12-14 give the Commission power to relax and issue directions, and repeal the RERC (Intra-state ABT) Regulations, 2006 while saving actions taken under them (p10). The Schedule provides the Additional Charge tables (pp11-12).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Scheduling and despatch

Read with this

Amendments and corrections

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document