Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Rajasthan Electricity Regulatory Commission's principal regulation replacing the intra-state ABT regime with a frequency-linked Deviation Settlement Mechanism (DSM) for Rajasthan. It applies to state generating stations including captive plants above 5 MW and to all distribution licensees (including deemed licensees), with carve-outs for nuclear, run-of-river/irrigation hydro, solar and wind, and for the open-access portion of a station's capacity (p4). Charges are worked out on average time-block frequency at CERC DSM 2014 rates, with caps for coal/lignite/APM-gas stations and zero charges beyond stated over/under-drawal tolerances (pp4-5).
The core is Regulation 6, which sets volume limits as percentages of schedule (or MW), makes over-drawal and under-injection impermissible outside a frequency band, adds Additional Deviation Charges in three frequency zones, and requires net deviation sign reversal every 12 time blocks (pp4-6). SLDC computes and publishes deviation accounts monthly and weekly (p6), while Regulation 9 covers State Energy Accounts, the State Deviation Pool Account Fund and its appropriation waterfall (pp7-8). Regulation 10 sets payment timelines, default interest, Letter of Credit requirements for prior defaulters, and a 15-day verification window (pp8-9). Regulations 12-14 give the Commission power to relax and issue directions, and repeal the RERC (Intra-state ABT) Regulations, 2006 while saving actions taken under them (p10). The Schedule provides the Additional Charge tables (pp11-12).
Read with this
Amendments and corrections
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.