Public Notice on Detailed Procedure for Forecasting, Scheduling and Imbalance Handling of Wind and Solar RE Stations, 2016
Public Notice
Public notice on a draftDated 12 Feb 2016
Draft
Voltaic holds no final regulation made from this draft.
Public notice on the RE Forecasting, Scheduling and Imbalance Handling Procedure (Inter-State), 2016 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public notice from the Central Electricity Regulatory Commission inviting comments on a Detailed Procedure prepared by the National Load Dispatch Centre for the forecasting, scheduling and imbalance handling of renewable generating stations (p1).
The notice opens by recording that under Regulation 6.5(23) of the CERC (Indian Electricity Grid Code) Regulations, 2010, NLDC is required to prepare a detailed procedure for scheduling and forecasting of Renewable Generating Stations and to submit it to the Commission for approval (p1).
It then states that NLDC submitted such a procedure by letter dated 21 October 2015, covering wind and solar generating stations at inter-State level, and also submitted a second procedure dealing with scheduling, metering, energy accounting and operational and commercial responsibilities of solar power generators and the solar power park developer (p1). A consolidated Detailed Procedure is said to be enclosed as an Appendix to the notice (p1).
Stakeholders and members of the public may comment by 26 February 2016, after which the Commission will finalize and notify the Detailed Procedure (p1). The notice does not itself set any operating, scheduling or commercial parameters — it is the consultation gateway to the procedure that does.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the notice dated 12 Feb 2016RE Forecasting, Scheduling and Imbalance Handling Procedure (Inter-State), 2016 — Draft
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.