RE Forecasting, Scheduling and Imbalance Handling Procedure (Inter-State), 2016 — Draft

PROCEDURE FOR IMPLEMENTATION OF THE FRAMEWORK ON FORECASTING, SCHEDULING AND IMBALANCE HANDLING FOR RENEWABLE ENERGY (RE) GENERATING STATIONS BASED ON WIND AND SOLAR ENERGY AT INTER-STATE LEVEL

Draft procedureReleased with the notice dated 12 Feb 2016

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Draft CERC procedure (12 February 2016) — This is a draft procedure issued by the Central Electricity Regulatory Commission for implementing the framework on forecasting, scheduling and imbalance handling for renewable energy generating stations based on wind and solar energy at inter-state level (p1). Its scope is expressly inter-state, and it is directed at wind and solar RE generating stations and QCAs (p1, p21).

The procedure is format-driven. Page 21 introduces Format A, the format for forecast and schedule data to be submitted by wind/solar plants and QCAs a day in advance. Page 23 carries further numbered form items linked to the formats.

The cover page states the draft date and the framework being implemented but does not cite an enabling provision or gazette publication date (p1). It is a draft, and no amendment, repeal or supersession is stated (p1).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM)

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document