RE Forecasting, Scheduling and Imbalance Handling Procedure (Inter-State), 2016 — Draft
PROCEDURE FOR IMPLEMENTATION OF THE FRAMEWORK ON FORECASTING, SCHEDULING AND IMBALANCE HANDLING FOR RENEWABLE ENERGY (RE) GENERATING STATIONS BASED ON WIND AND SOLAR ENERGY AT INTER-STATE LEVEL
Draft procedureReleased with the notice dated 12 Feb 2016
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Draft CERC procedure (12 February 2016) — This is a draft procedure issued by the Central Electricity Regulatory Commission for implementing the framework on forecasting, scheduling and imbalance handling for renewable energy generating stations based on wind and solar energy at inter-state level (p1). Its scope is expressly inter-state, and it is directed at wind and solar RE generating stations and QCAs (p1, p21).
The procedure is format-driven. Page 21 introduces Format A, the format for forecast and schedule data to be submitted by wind/solar plants and QCAs a day in advance. Page 23 carries further numbered form items linked to the formats.
The cover page states the draft date and the framework being implemented but does not cite an enabling provision or gazette publication date (p1). It is a draft, and no amendment, repeal or supersession is stated (p1).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 12 Feb 2016Public notice: Public Notice on Detailed Procedure for Forecasting, Scheduling and Imbalance Handling of Wind and Solar RE Stations, 2016
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.