MSERC · Meghalaya State Electricity Regulatory Commission
Standard of Performance Regulations, 2012
The Meghalaya State Electricity Regulatory Commission (Standard of Performance) Regulations 2012
RegulationDated 15 Jan 2013Published in the Gazette 4 Oct 2012No.MSERC/MSERC-2013/77/ 01 dated 15th January, 2013
Replaced by Meghalaya Standard of Performance (7 of 2026) Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Meghalaya State Electricity Regulatory Commission issued these Standard of Performance Regulations by notification dated 15 January 2013, stating they had already been published in the Meghalaya Gazette issue dated 4 October 2012 (p1). They apply to every distribution licensee in Meghalaya, including deemed licensees under section 14 of the Electricity Act 2003, and to their consumers (p2). The regulations come into force from the date of publication in the official Gazette and supersede the current SOP regulations (p2); section 14 repeals the MSERC (Standard of Performance) Regulations 2006 with a savings clause and gives these SOP provisions precedence over other MSERC regulations until separate orders are issued (p10).
The main body sets the framework. Definitions and interpretation cover licensee, area of supply, call centre, voltage bands, rural and urban areas, and consumer indexing (pp2–3). The objectives are to lay down performance standards, measure service, ensure minimum network performance and gradually improve customer service (p4). Legal provisions explain the Commission's power to specify standards, compensation for failure, reporting by licensees, annual publication and penal action against responsible officials (pp4–5). Sections 7 to 10 establish guaranteed standards (Schedule-I), overall standards (Schedule-II) and compensation (Schedule-III), require consumer indexing, a complaint-handling manual within six months, call centres and public awareness, and prescribe quarterly reporting (pp5–9). Sections 11 to 14 list events that suspend the standards, and give the Commission power to remove difficulties and amend the regulations (pp9–10).
Schedule-I contains the guaranteed standards by service area: call centre response and registration, restoration of supply after fuse-off, overhead/underground cable faults and transformer failure, scheduled outages, voltage quality, meter reading/testing/replacement, shifting of meters and lines, new connections and load enhancement, temporary supply, bill complaints, disconnection and reconnection (pp11–16). Schedule-II sets overall standards and reliability indices — SAIFI, SAIDI and MAIFI — with formulae and feeder-level methodology (pp16–20). Schedule-III is the compensation table for defaults under Schedule-I (pp20–21). Annexures I–III give quarterly reporting formats for guaranteed standards, overall standards, reliability indices and complaint registration (pp21–26).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.