MERC · Maharashtra Electricity Regulatory Commission
Deviation Settlement Mechanism and related matters Regulations, 2026
Maharashtra Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2026
RegulationDated 21 Sep 2026No. MERC/Tech/Regulation/2026/0782 dated 21st September 2026
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Maharashtra Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2026 replace the 2019 DSM framework for intra-state grid users, with most provisions commencing on Gazette notification but the commercial and deviation-charge provisions deferred to a later Commission order (p33). Regulations 1–3 set commencement, objective and definitions, including special seller categories for wind/solar/hybrid, MSW/RDF, biomass/cogen and run-of-river hydro (p33–38). Regulation 4 applies the DSM to short-, medium- and long-term open access using InSTS, to general sellers, open-access and captive generators excluding in-situ captive, to distribution licensees, deemed licensees and full open-access consumers; small hydro, bagasse/biomass with an exportable schedule of 5 MW or more and MSW/RDF are addressed with staged or commercial application, while wind and solar remain governed by the 2018 forecasting and scheduling regulations (p38–39). Regulations 5–6 set SLDC and state entity duties and DSM design parameters: 96 fifteen-minute time blocks, scheduling and despatch principles, frequency operating range by reference to IEGC and the State Grid Code, deviation and weekly settlement (p39–42). Regulation 7 gives deviation formulas for general sellers and buyers; Regulation 8 defines the Normal Rate by reference to power-exchange ACPs and ancillary service charges; Regulation 9 deals with gaming; Regulation 10 sets frequency-linked charges for deviation for general sellers, RoR hydro, buyers and standalone storage, volume limits, infirm power and outage treatment (p42–48). Regulations 11–13 create the Virtual State Entity for centralized MoD despatch, monitoring, and State Energy Account and reactive energy accounting (p48–52). Regulations 15–18 cover SLDC instructions, the State Deviation Pool Account waterfall, SLDC fees, payment timelines and Letter of Credit security (p52–55). Regulation 19 continues MSPC governance with expanded stakeholder representation; Regulation 20 provides a transition with SLDC procedures within three months and at least six months’ mock trial; Regulation 26 repeals the 2019 Regulations with savings (p55–58).
Read with this
Commencement notices and reasons
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.