Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulations, 2026 — Statement of Reasons

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2026 — STATEMENT OF REASON

Statement of reasonsDated 21 Sep 2026

The commission's reasons for the Deviation Settlement Mechanism and related matters Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 27 of 51. Check the regulator's original before you rely on it.

This is MERC's Statement of Reasons (SoR) dated 21 September 2026 accompanying the MERC (Deviation Settlement Mechanism and related matters) Regulations, 2026 (p1). It explains why the Commission revised the 2019 DSM framework and records the public consultation on the draft 2025 regulations, including 18 stakeholder responses (p2). The portion covers pp1-27 only; the contents list shows later chapters up to p49 on VSE, reactive energy, deviation pool, payment security, governance and transition (pp3-4).

Chapters 1-2 (pp7-13) deal with definitions and applicability. The Commission modifies the Reference Charge Rate to include fuel-related adjustment as considered in merit order dispatch and aligns it with CERC's final definition when notified; it also adds WS and MSW seller definitions (pp7-10). DSM applies to general sellers, open access and captive generators connected to InSTS, with special treatment for small hydro and bagasse/biomass at an exportable schedule of 5 MW or more, while wind/solar remain under the 2018 RE F&S regulations and MSW/RDF are excluded until further notification (pp10-13).

Chapters 3-6 (pp13-21) cover interface metering, scheduling/despatch principles, deviation computation and the normal rate. STU is directed to meter all InSTS interface points with AMR and 15-minute data within six months (pp13-14). Exchange contracts are kept outside MoD principles but may be curtailed per IEGC/CERC; hydro is moved to general-seller treatment with no schedule replacement, and the frequency band remains aligned with central regulations (pp14-18). The normal rate remains the highest of I-DAM ACP, RTM ACP, or a composite including ancillary service charges (pp21-22).

Chapter 7 sets deviation charges: capacity-linked volume limits for general sellers, ESS treatment as general sellers with charging-mode inversion, buyer volume limits linked to NCPD and a reserve margin with SLDC, and infirm power injection rules (pp22-27). Later parts per the contents cover VSE (p32), reactive energy (p37), pool account (p38), delay/LC (pp42-44), governance (p45) and transition (p46).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document