Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2017 — Draft
TAMIL NADU ELECTRICITY REGULATORY COMMISSION (FORECASTING, SCHEDULING AND DEVIATION SETTLEMENT FOR SOLAR AND WIND GENERATION) REGULATIONS, 2017
Draft amendmentDated 28 Dec 2017No.TNERC/F&S Solar & Wind/ dated dt. .12.2017
Draft
A proposal that has since been finalised as the Conduct of Business Regulations, 2004 — Amendment, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Tamil Nadu Electricity Regulatory Commission's draft Forecasting, Scheduling and Deviation Settlement Regulations for solar and wind generation, published for objections and suggestions by 27.01.2018 (p1). It is proposed under the Electricity Act 2003 and would apply to all wind and solar generators in Tamil Nadu except rooftop PV, connected to the intra-state transmission or distribution system, including through pooling sub-stations, whether they self-consume or sell power within or outside the State (p1, p7). It would commence on publication in the Tamil Nadu Government Gazette, but the commercial arrangements and related deviation charges and penalty are deferred by six months (p2).
Part A sets the objective — grid integration of wind and solar while maintaining grid stability — and directs the SLDC to use forecasts and conventional-generation flexibility; it also provides for review after two years (pp6–7). Part B contains the Forecasting and Scheduling Code. Generators at a pooling sub-station must appoint a Qualified Co-ordinating Agency (QCA), which registers with the SLDC, acts as the single point of contact, provides data and aggregated forecasts, communicates schedules and settles deviation charges; stand-alone generators may act as their own QCA (pp7–10). The Code specifies day-ahead and week-ahead schedules in 15-minute blocks, intra-day revisions, wind banked-energy withdrawal schedules, and the contents of a Detailed Procedure to be submitted by the SLDC (pp10–12). It also treats gaming through penalties and possible cancellation of QCA registration (p13).
Part C sets commercial arrangements. Intra-state sale is settled on actual generation, with deviations settled through the State Deviation Pool and Table 1 setting charges by absolute-error slab (pp14–15). Inter-state sale is settled on scheduled generation, requires a separate feeder at a pooling sub-station, uses separate schedules to the SLDC and RLDC, and leaves inter-state consequences to the CERC DSM regulations; the Annexure governs under-injection charges for outside-State sales (pp16–17, pp24–25). Part D covers metering, energy accounting, QCA–SLDC communication, deviation accounting and billing, payment and late surcharge, de-pooling, curtailment intimation and weekly energy accounts (pp18–22). Part E gives the Commission powers to amend, remove difficulties and relax (pp22–23). The Explanatory Statement links the draft to the CERC's 2015 framework and Forum of Regulators-endorsed model state regulations (pp26–27).
Read with this
The regulation
- Dated 8 Jan 2004Tamil Nadu Conduct of Business Regulations, 2004
Amendments and corrections
- Dated 9 Apr 2013Conduct of Business Regulations, 2004 — Amendment, 2013
- Dated 18 Mar 2019Conduct of Business Regulations, 2004 — Amendment, 2019
Earlier drafts
- Dated 1 Mar 2013Conduct of Business Regulations, 2004 — Draft Amendment, 2013
- Dated 13 Dec 2013Conduct of Business Regulations, 2004 — Draft Amendment (Quorum)
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.