Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2017 — Draft

TAMIL NADU ELECTRICITY REGULATORY COMMISSION (FORECASTING, SCHEDULING AND DEVIATION SETTLEMENT FOR SOLAR AND WIND GENERATION) REGULATIONS, 2017

Draft amendmentDated 28 Dec 2017No.TNERC/F&S Solar & Wind/ dated dt. .12.2017

Draft

A proposal that has since been finalised as the Conduct of Business Regulations, 2004 — Amendment, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Tamil Nadu Electricity Regulatory Commission's draft Forecasting, Scheduling and Deviation Settlement Regulations for solar and wind generation, published for objections and suggestions by 27.01.2018 (p1). It is proposed under the Electricity Act 2003 and would apply to all wind and solar generators in Tamil Nadu except rooftop PV, connected to the intra-state transmission or distribution system, including through pooling sub-stations, whether they self-consume or sell power within or outside the State (p1, p7). It would commence on publication in the Tamil Nadu Government Gazette, but the commercial arrangements and related deviation charges and penalty are deferred by six months (p2).

Part A sets the objective — grid integration of wind and solar while maintaining grid stability — and directs the SLDC to use forecasts and conventional-generation flexibility; it also provides for review after two years (pp6–7). Part B contains the Forecasting and Scheduling Code. Generators at a pooling sub-station must appoint a Qualified Co-ordinating Agency (QCA), which registers with the SLDC, acts as the single point of contact, provides data and aggregated forecasts, communicates schedules and settles deviation charges; stand-alone generators may act as their own QCA (pp7–10). The Code specifies day-ahead and week-ahead schedules in 15-minute blocks, intra-day revisions, wind banked-energy withdrawal schedules, and the contents of a Detailed Procedure to be submitted by the SLDC (pp10–12). It also treats gaming through penalties and possible cancellation of QCA registration (p13).

Part C sets commercial arrangements. Intra-state sale is settled on actual generation, with deviations settled through the State Deviation Pool and Table 1 setting charges by absolute-error slab (pp14–15). Inter-state sale is settled on scheduled generation, requires a separate feeder at a pooling sub-station, uses separate schedules to the SLDC and RLDC, and leaves inter-state consequences to the CERC DSM regulations; the Annexure governs under-injection charges for outside-State sales (pp16–17, pp24–25). Part D covers metering, energy accounting, QCA–SLDC communication, deviation accounting and billing, payment and late surcharge, de-pooling, curtailment intimation and weekly energy accounts (pp18–22). Part E gives the Commission powers to amend, remove difficulties and relax (pp22–23). The Explanatory Statement links the draft to the CERC's 2015 framework and Forum of Regulators-endorsed model state regulations (pp26–27).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

The regulation

Amendments and corrections

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document