Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Conduct of Business Regulations, 2004 — Amendment, 2013

Notification No.TNERC / CBR/1-1 dated : 9.4.2013

AmendmentDated 9 Apr 2013TNERC / CBR/1-1 dated 9.4.2013

Amends the Tamil Nadu Conduct of Business Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TNERC's notification No. TNERC/CBR/1-1 dated 9.4.2013 (p1) makes a single-clause amendment to the TNERC Conduct of Business Regulations, 2004, substituting sub-regulation (6). The substituted text requires all orders of the Commission to be communicated to the parties in the proceedings under the signature of the Secretary, or an officer empowered by the Commission, "within seven days from the date of making of the order by the Commission" (p1). The notification states it is issued under s.181(1) read with s.181(2)(zl) and s.92(1) of the Electricity Act, 2003, and records that the draft was previously published as required by s.181(3) (p1).

Page 2 carries the Explanatory Statement, which describes the purpose as fixing a time limit of seven days for despatching orders passed by the Commission, and a two-column statement showing the existing provision against the provision after amendment (p2). The document states no commencement clause and no Gazette publication date; the only date printed is the notification date, 9.4.2013.

Standard name
Conduct of Business Regulations

Read with this

The regulation

Amendments and corrections

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document