Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Meghalaya Standard of Performance Regulations, 2026 — Draft

Meghalaya State Electricity Regulatory Commission (Standard of Performance) Regulations, 2026

Draft regulationDated 19 Aug 2026No. MSERC/SOP-REG/2026/ dated 19th AUGUST 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Meghalaya State Electricity Regulatory Commission issued this pre-publication notification (p1, p3) to consult on a replacement for its 2012 Standard of Performance regulations. It sets out draft guaranteed and overall standards of performance for distribution licensees in Meghalaya, the complaint-handling machinery supporting them, the compensation payable when guaranteed standards are missed, and the reporting formats licensees must use.

Regulations 1–2 give the title and bring the instrument into force on Gazette publication, applying it to all distribution licensees, including deemed licensees under s.14, and their consumers. Regulation 3 defines the vocabulary, notably the rural/urban split that drives almost every timeline in the Schedules, consumer indexing, and the interruption indices. Regulations 4–5 state objectives and the statutory basis, including compensation and penal exposure for responsible officers.

Regulation 6 is the fulcrum: Schedule-I standards are mandatory minimum guaranteed standards, Schedule-II standards are targets the licensee must strive for at a stated success rate, and failure of a guaranteed standard triggers Schedule-III compensation. Regulations 7–13 require a published complaints manual, complaint registration and a lodgement and resolution procedure, 24x7 toll-free call centres, consumer awareness measures, consumer indexing, and a compensation mechanism that is automatic where remote monitoring proves default and ring-fenced from the ARR. Regulations 14–19 require quarterly reporting, define what counts as a power interruption and when standards stand suspended, and give the Commission powers to remove difficulties and to amend; regulation 18 subordinates the SOP to the Supply Code on conflict and regulation 19 repeals the 2012 regulations with a savings clause.

The operative detail sits in the Schedules and Annexures: Schedule-I fixes deliverable timelines for call centres, restoration of supply, voltage quality, metering, shifting, new connections, temporary supply, billing complaints, disconnection and reconnection; Schedule-II sets overall success rates, faulty-meter and billing-error tolerances, streetlight and load-shedding duties, and reliability index limits; Schedule-III prices each default; Annexures I–VII give the quarterly reporting formats.

Standard name
Standards of Performance
Primary topics
Standards of performance, Consumer grievance redressal (CGRF), Billing and payment

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document