MSERC · Meghalaya State Electricity Regulatory Commission
Meghalaya Standard of Performance Regulations, 2026 — Draft
Meghalaya State Electricity Regulatory Commission (Standard of Performance) Regulations, 2026
Draft regulationDated 19 Aug 2026No. MSERC/SOP-REG/2026/ dated 19th AUGUST 2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Meghalaya State Electricity Regulatory Commission issued this pre-publication notification (p1, p3) to consult on a replacement for its 2012 Standard of Performance regulations. It sets out draft guaranteed and overall standards of performance for distribution licensees in Meghalaya, the complaint-handling machinery supporting them, the compensation payable when guaranteed standards are missed, and the reporting formats licensees must use.
Regulations 1–2 give the title and bring the instrument into force on Gazette publication, applying it to all distribution licensees, including deemed licensees under s.14, and their consumers. Regulation 3 defines the vocabulary, notably the rural/urban split that drives almost every timeline in the Schedules, consumer indexing, and the interruption indices. Regulations 4–5 state objectives and the statutory basis, including compensation and penal exposure for responsible officers.
Regulation 6 is the fulcrum: Schedule-I standards are mandatory minimum guaranteed standards, Schedule-II standards are targets the licensee must strive for at a stated success rate, and failure of a guaranteed standard triggers Schedule-III compensation. Regulations 7–13 require a published complaints manual, complaint registration and a lodgement and resolution procedure, 24x7 toll-free call centres, consumer awareness measures, consumer indexing, and a compensation mechanism that is automatic where remote monitoring proves default and ring-fenced from the ARR. Regulations 14–19 require quarterly reporting, define what counts as a power interruption and when standards stand suspended, and give the Commission powers to remove difficulties and to amend; regulation 18 subordinates the SOP to the Supply Code on conflict and regulation 19 repeals the 2012 regulations with a savings clause.
The operative detail sits in the Schedules and Annexures: Schedule-I fixes deliverable timelines for call centres, restoration of supply, voltage quality, metering, shifting, new connections, temporary supply, billing complaints, disconnection and reconnection; Schedule-II sets overall success rates, faulty-meter and billing-error tolerances, streetlight and load-shedding duties, and reliability index limits; Schedule-III prices each default; Annexures I–VII give the quarterly reporting formats.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 19 Aug 2026Public notice: Draft Standard of Performance Regulations, 2026 — Public Notice
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.