MSERC · Meghalaya State Electricity Regulatory Commission
Draft Standard of Performance Regulations, 2026 — Public Notice
Submission of comments and suggestions on the Draft Meghalaya State Electricity Regulatory Commission (Standard of Performance) Regulations, 2026
Public notice on a draftDated 19 Aug 2026MSERC/SOP-REG/2026/182 dated 19th August 2026
Draft
Voltaic holds no final regulation made from this draft.
Public notice on the Meghalaya Standard of Performance Regulations, 2026 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public notice (p1) by which the Meghalaya State Electricity Regulatory Commission opens formal consultation on a proposed re-enactment of its Standard of Performance Regulations. The Commission records that the 2012 SOP Regulations, notified on 15 January 2013, currently apply to all distribution licensees — including deemed licensees under section 14 of the Electricity Act — and to all consumers in Meghalaya (p1, para 1). It notes that it has since notified the Meghalaya (Electricity Supply Code) Regulations, 2026 on 22 April 2026 in line with the Electricity (Rights of Consumers) Rules 2020, and that it reviewed its existing regulations to align with those instruments, proposing re-enactment (p1, paras 2–3).
The draft Meghalaya State Electricity Regulatory Commission (Standard of Performance) Regulations, 2026 is pre-published under section 181(3) of the Electricity Act, 2003, with written comments, suggestions and objections invited in a prescribed format to the Secretary at the Commission's Shillong office or by email by 11 September 2026 (21 days); submissions received later will not be entertained (p1, paras 4–7).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 19 Aug 2026Meghalaya Standard of Performance Regulations, 2026 — Draft
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.