Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Grid Interactive Rooftop Solar PV System for Prosumers Regulations, 2024 — Draft

West Bengal Electricity Regulatory Commission (Grid Interactive Rooftop Solar PV System for Prosumers) Regulations, 2024

Draft regulationDated 3 Oct 2024WBERC/Regulation-79/24-25/ 5550 dated 03rd October, 2024

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a consultation package issued by the West Bengal Electricity Regulatory Commission. Page 1 is a public notice dated 3 October 2024 stating that the draft regulations are on the Commission's website and inviting comments, suggestions and objections to its New Town, Kolkata office by 14 November 2024, 3 P.M.

Pages 2–18 are the draft notification itself, by which the Commission proposes to make the WBERC (Grid Interactive Rooftop Solar PV System for Prosumers) Regulations, 2024 under the Electricity Act, 2003, extending to the whole of West Bengal and taking effect from Gazette publication. Part A (pp2–12) is the general framework: definitions of prosumer and of the net metering, net billing/net feed-in and gross metering arrangements; scope and applicability; prosumer rights; the application procedure; duties of distribution licensees, including an online portal, model forms, technical-feasibility and commissioning timelines, and who bears upgrade costs; monitoring and reporting to the State Load Despatch Centre; interconnection and power-quality requirements; metering; treatment of rooftop solar for RPO compliance; and the basis on which feed-in tariff is built.

Parts B, C and D (pp12–17) deal separately with the three commercial arrangements, each setting eligibility, billing-period accounting, carry-forward and reset rules, and a worked settlement formula. Part E (pp17–18) covers interpretation, the Commission's power to amend and to relax provisions, and a repeal-and-saving clause removing specified provisions of the 2013 Cogeneration and Renewable Sources Regulations and their 2020 amendment. Model formats follow at pp19–25.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, Gross metering

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document