Grid Interactive Rooftop Solar PV System for Prosumers Regulations, 2024 — Explanatory Memorandum
Explanatory Memorandum to West Bengal Electricity Regulatory Commission (Grid Interactive Rooftop Solar PV System for Prosumers) Regulations, 2024
Explanatory memorandum to a draftReleased with the draft dated 3 Oct 2024
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to the Grid Interactive Rooftop Solar PV System for Prosumers Regulations, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Explanatory Memorandum to the WBERC (Grid Interactive Rooftop Solar PV System for Prosumers) Regulations, 2024. It explains why the Commission proposes a separate set of rooftop-solar prosumer regulations instead of relying on the earlier cogeneration and renewable-energy regulations, and it sets out the policy choices the draft regulations are expected to carry (pp1, 4–5).
Pages 2–3 provide a summary: the national renewable-energy push, consumer-rights rules requiring the Commission to frame regulations, the need to update earlier West Bengal regulations, and the three metering modes as the main design choice. Pages 4–5 give the legal rationale under the Electricity Act and the Electricity (Rights of Consumers) Rules, 2020, as amended up to 22.02.2024, and state the objectives: promote rooftop PV, facilitate net metering, net billing and gross metering, align state rules with central rules, and balance consumer and licensee interests. They also describe the governing principles: prosumers keep consumer status, may set up RE units themselves or through a service provider, and may use non-roof premises subject to capacity limits.
Pages 5–7 explain the three arrangements. Net metering offsets exported energy against imported energy in a bi-directional meter, with net export carried forward; net billing offsets the monetary value of exports at feed-in tariff against imports at retail tariff; gross metering uses separate generation and consumption meters and settles monetarily. A worked example table on page 6 compares the three. Page 7 sets net-metering eligibility—1 kW or above contract demand or sanctioned load, system from 1 kW up to 500 kW or the contract demand or sanctioned load, whichever is lower—and proposes a minimum first-come-first-serve net-metering capacity allocation among the four distribution licensees, using the CEA 20th Electric Power Survey and a formula, with a table for 2024-25.
Page 8 covers net-billing and gross-metering eligibility (1 kW or above, 1 kW minimum capacity, maximum up to contract demand or sanctioned load, with no 500 kW cap stated) and proposes a feed-in tariff equal to average power purchase cost plus savings from transmission and distribution losses; a table illustrates the calculation for WBSEDCL, CESC and IPCL. Page 9 justifies the rate against Green Day Ahead market prices and indicative returns, and covers recovery of fixed charges, meter rent, electricity duty and separate bill disclosure, connectivity procedure, deemed acceptance for systems up to 10 kW, and load enhancement. Page 10 covers RPO treatment, cross-references the draft regulations for licensee duties, prosumer rights, application procedure, interconnection, metering, standards and safety, and monitoring in Regulation 7, and ends with an undated signature block.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.